Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2024 at 7:00 PM
Updated November 21, 2024
Site work and paving for a mixed-use development in Gillette, Wyoming. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Separate sealed Bids for the Furnishing of: Allen Avenue Improvements Generally Described as: Full Depth Removal of All Pavement Along Allen avenue Between Sutherland Drive and Lakewayroad Including Removal and Replacement of Majorityof Pcc Curb and Gutter, Valley Gutter, Fillets, Adaramps, Driveways, and Sidewalks to Facilitatechanging the Grade of the Existing Road Profile. Pccstorm Drain Box Culvert Crossing Allen Avenue Willbe Removed as Well as Removal of Approximately 520lf of Pcc Low Flow Drainage Channel East of Allenavenue to Be Replaced With 42" Rcp Storm Drainmain Including Inlets, Structures, Fittings,appurtenances, Headwall and Pcc Low Flow Channeltransition. Existing Channel to Be Filled Andresurfaced With Pcc Drain Pan and Surfacing. Remove Existing Storm Drain System in Allenavenue and Install Curb Inlets and Storm Drainlaterals. Remove and Replace Existing Prefabricatedfiberglass Dewatering Well and Force Main Dischargepipe Near Lakeway Road. Install Approximately 410lf of New 8" Pvc Sanitary Sewer Main Includingreconnecting 4" Pvc Services, Manholes, Fittingsand Appurtenances Along New Alignment Whileremoving and or Abandoning Existing Sanitary Sewermain and Manholes. Minor Water Fitting Replacementalong Allen Avenue Between Sutherland Drive Andsutherland Lane Cove Including 110 Lf of 6" And8" Pvc Water Main, Hydrants, Valves, Mainlowering, Fittings, and Appurtenances. Alternate Work Includes Full Pavement Replacementof Approximately 4000 Sy as Either 4" Asphalticconcrete Paving or 7" Portland Concrete Cementpaving With Respective Aggregate Base Coursesections. Additional Alternate Work Includes Removalof Approximately 375 Lf of Additional Pcc Lowflow Drainage Channel West of Allen Avenue to Bereplaced With 42" Rcp Storm Drain Main Includinginlets, Structures, Fittings, Appurtenances, Andrelocation of Base Bid Headwall and Pcc Low Flowchannel Transition. Existing Channel to Be Filled Andresurfaced With Landscape Surfacing. Bids Must Be Appropriately Marked: Allen Avenue Improvements the City of Gillette Reserves Theright to Reject Any and All Bids.
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2024
December 19, 2024
Allen Ave, Gillette, WY
Related To This Project
Gillette, WY
--
Gillette, WY
Bid Date: Dec 10 2024
Gillette, WY
Bid Date: Dec 03 2024
Gillette, WY
Bid Date: Dec 03 2024
Gillette, WY
Bid Date: Dec 03 2024
Gillette, WY
Bid Date: Dec 17 2024
Gillette, WY
Bid Date: Mar 25 2025
Gillette, WY
Bid Date: Oct 28 2024
Gillette, WY
Bid Date: Nov 06 2024
Gillette, WY
Bid Date: Apr 01 2025
Gillette, WY
Bid Date: Dec 16 2024
Gillette, WY
Bid Date: Nov 05 2024
Gillette, WY
--
Gillette, WY
Bid Date: Oct 01 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
