BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Walstonburg, North Carolina. Completed plans call for the demolition of a residential development; and for site work for a residential development.

On behalf of the Town of Saratoga we will receive separate sealed bids for demolition/clearance for one (1) house under the Town of Saratoga 2021 CDBG-NR Project. The Town expects demolition/clearance removal to be completed within 30 days from the Notice to Proceed. Evidence of insurance is due before the start of any work. The Town of Saratoga will enter into contract for the work and will select the Contractor whose proposal represents the best interests of the Town. The Town of Saratoga is an equal opportunity employer and service provider. Small, minority, and/or women owned, Historically Underutilized Business (HUB), and Section 3 (low income) businesses and labor surplus area firms are encouraged to submit BIDS. The Fair Housing Act prohibits discrimination in housing based on race, color, national origin, religion, sex, family status, and disability. The Town of Saratoga reserves the right to accept or reject any and all bids If you have any questions, call me at 252-521-3229 (cell). Energy Star Home -(To include all energy star components from Manufacturer.) > Built to state building code for modular unit with modular stamp. > Vinyl Sided with OSB exterior sheathing/Shingle Roof- 5/12 minimum pitch with caves and Architectural Type Shingles. Unfurnished home. Color ofsiding, shingles, shutters, etc. to be acceptable to owner. > Price to include all permits including set-up, plumbing, electrical, HVAC, etc. necessary to pass City/County inspections. > All blocking and tic-downs shall be in accordance with Building Code and bottom of unit will be a minimum height 24" above ground level. Including poured concrete footing for all block piers. > Steps are to be provided at all entrances. > Steps for Modular Housing units shall be as close to threshold height as possible. > Install minimum 6' x 8' suspended corrugated concrete porch with brick steps and handrails at front entrance and minimum 4' x 6' concrete porch with brick steps and handrails at rear entrance. Porches to include vinyl railings, handrails, pickets, vinyl sleeve over pressure treated 4" x 4" posts at steps and porches. Install vinyl handrails, pickets on both sides ofsteps at all entrances. > If client desires, pressure treated lumber decks may be substituted minimum 8' x 10' at front entrance and 6' x 8' at rear entrance with pressure treated steps, handrails, railings, pickets, posts, etc. Handrails shall be made ofpressure treated 4" x 4" posts and 2" x 4" rails with rails at top and mid-height ofposts. Handrails to be anchored securely in ground. Pickets should be pressure treated 2"x 2" 4" apart. Railings at decks shall be made of pressure treated 4" x 4" posts and 2" x 4" rails with 2"x 2" pickets 4" apart. Install treated handrails on both sides ofsteps at all entrances. > Baths to have porcelain sink, one piece fiberglass tub/shower-hall bath, one piece fiberglass shower stall with door-master bath Kitchen to have stainless steel sink No plastic plumbing fixtures in baths or kitchen. > All bedroom doors and bathroom doors to have privacy lock All interior doors to be raised panel doors. Exterior steel 6-panel front door with storm door. Exterior cottage mswing rear door (9- lite) with storm door at rear entrance. > Electrical service 200 Amp. To be provided for all units and shall include service pole or pedestal (as appropriate or requires), meter base, breaker panel and connection to home in accordance with Electrical Code. Contractor to coordinate work with power-company and Building Inspector. > Modular Units to be underpinned with brick on a continuous poured concrete footing 6" thick by 10" wide and bottom offooting is to be 12" below ground level. Louvered foundation vents to be provided according to Building Code and metal foundation access door. Unit height above ground to be a minimum of24". > Contractor shall connect unit to water supply with minimum Schedule 40 'A" PVC water line, two outside spigots and cut-off valve in value box within 5' ofhouse. Water line to be buried up to connection to unit. Install foam insulation on all exposed water lines under dwelling. > Contractor to connect unit to septic tank or sewer tap with sewer line as required by code. > Contractor to provide street number address on unit in accordance with Local E-911 requirements. > Tongues, wheels and axles to be removed and retained by Contractor. Tongues cannot be placed under unit prior to underpinning. Esta información está disponible en español o en cualquier otro idioma bajo petición. Por favor, póngase en contacto con Brenda Wilson, Town Clerk, at 252-238-3487 o en 6904 Main Street, Saratoga, NC 27873 de alojamiento para esta solicitud.This Municipality is an Equal Opportunity Employer and Service Provider. The Town has received $593,000 in a federal 2020 CDBG-NR grant representing 100% of total project costs to undertake housing clearance and reconstruction (replacement on site). The Town supports and encourages support of the Fair Housing Act which prohibits discrimination in housing based on race, color, national origin, religion, sex, family status, and disability This municipality is an Equal Opportunity Employer and Service Provider.

Post-Bid

Residential Subdivision

$593,000.00

Public - City

Demolition, Site Work

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
44
Bidding Soon
964
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

img_map_placeholder

To Be Determined, Walstonburg, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.