BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Project scope of work includes upgrades and enhancements to the perimeter fencing and vehicular and pedestrian gate access at five Valley Water sites, including: Site 1: Coyote Pumping Plant, 1833 Peet Road, Morgan Hill, CA Replace 1,728 linear feet (LF) of existing 6-foot to 7-foot-high fencing with 9-foot high mini-mesh chain-link fence; replace one existing pedestrian gate; replace two existing 20-foot-long manual vehicular gates; and replace one 25-foot-long automatic vehicular security gate. Site 2: Santa Teresa Water Treatment Plant, 7011 Graystone Lane, San Jose, CA Replace 2,725 linear feet (LF) of existing 6-foot to 8-foot-high fencing with 9-foot high mini-mesh chain-link fence; install 880 linear feet (LF) of new fencing along other segments of Valley Water's property line to include new fencing around the clear well; replace seven existing pedestrian gates; replace two existing 18-foot- long manual vehicular gates; and replace two 29-foot-long automatic vehicular security gates. Site 3: Winfield Complex, 5905 Winfield Blvd, San Jose, CA Replace 1,003 linear feet (LF) of existing 6-foot to 9-foot high fencing with 9-foot high mini-mesh chain-link fence; install 200 linear feet (LF) of new fencing along other segments of the Valley Water's property to extend the Gate A entrance and Gate B exit; replace one existing pedestrian gate; replace one existing 30-foot long manual vehicular gate; and replace one existing 28-foot long and one 30- foot long manual vehicular gates with new automatic vehicular security gate. Site 4: Headquarters, Corporate Yard, 5770 Almaden Expressway, San Jose, CA Replace 1,546 linear feet (LF) of existing 6-foot to 8-foot high fencing with 9-foot high mini-mesh chain-link fence; install 300 linear feet (LF) of new fencing along other segments of the Valley Water's property; replace two and install one new pedestrian gate; remove two 20-foot long and one 40-foot long manual vehicular gates and replace with 9-foot fencing; replace one 10-foot long manual vehicular gates; and replace three 20-foot long new automatic vehicular security gates with Site 5: Silicon Valley Advanced Water Purification Center, San Jose, CA new automatic vehicular security gates. Replace 1,929 linear feet (LF) of existing 6-foot to 8-foot-high fencing with 9-foot high mini-mesh chain-link fence; replace two existing and install one new pedestrian gate for Visitor Center relocation; replace two12-foot and one 24-foot manual vehicular gates; and replace one 40-foot and one 50-foot automatic vehicular security gates. Online Q&A Yes Q&A Deadline 11/11/2024 5:00 PM (PDT) License Requirements Class A Project Duration 320 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $3M - $4M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No questions will be entertained during this conference. Please submit written questions to the Q & A Tab of the Project Solicitation VW0507 at PlanetBids. The deadline to submit questions is November 11, 2024, by 5:00 p.m.

Post-Bid

Water / Sewer

$4,000,000.00

Public - County

Site Work

18

16

12

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
72
Bidding Soon
1,470
All Active Projects
555
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, San Jose, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.