BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Colebrook, New Hampshire. Completed plans call for site work for a water / sewer project.

Question Deadline 11/14/2024 Questions received less than five days prior to the date for opening of Bids may not be answered. The Project includes the following Work: The Base Bid includes mobilization and general conditions; site preparation and erosion control; replacement of the water main with new 2", 4", 6" and 8" pressure pipe, water appurtenances, and 1" water services; installation of two master water meter vaults; removal of an existing master meter vault; replacement of sewer main with new 8" PVC pipe; replacement of sewer services with new 6" PVC pipe; installation of 945 LF of swales and 445 LF of drain pipe to improve drainage on Second and Fifth Streets; replacement of the electrical distribution system and services; installation of crushed stone for roads; loaming and seeding of all other disturbed areas (not paved or gravel); and complete restoration of all properties, public and private, affected by the construction activities. Alternates include: Add Alternate A - Additional Crushed Stone and Surface Gravel on Roads: Includes an additional 4" of crushed stone and 2" of surface gravel on all roads. A 100% Payment and Performance Bond and 5% Bid Bond will be required. The successful bidder will be required to execute the Contract Agreement within 10 days following notification of the acceptance of their Bid. Completion time for the project will be calculated as calendar days from the date specified in the "Notice to Proceed" as follows 210 calendar days for substantial completion (Base Bid). 10 calendar days for substantial completion (Bid Alt A). 25 calendar days for final completion Liquidated damages will be in the amount of $1,000, for each calendar day of delay from the date established for substantial completion, and $1,000 for each calendar day of delay from the date established for final completion. Owner anticipates that the Project's base bid price will be approximately $2.55M. The owner reserves the right to reject any or all of the bids received and to waive any informalities in the bidding. There is a two-day grace period for bidders to withdraw their bids due to a material and substantial mistake, subsequent to the opening of bids, with consent of the Owner.

GC Bidding

Water / Sewer

$2,053,000.00

Public - City

Site Work

46

21

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
21
Bidding Soon
345
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, Colebrook, NH

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.