BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work and paving for a mixed-use development in Colebrook, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Main Street Roadway & Sidewalk Improvement Project The active construction is anticipated to start in 2026. Bidders should note that the prices contained in the proposal will be considered valid for the duration of the construction project. This municipally managed project funded Federally through the Transportation Alternative Program (TAP) and locally by the New Hampshire Department of Transportation involves reconstructing the Main Street sidewalks and approximately 2,700 feet of Main Street roadway in the downtown Colebrook, from approximately South Main Street to the Beaver Brook bridge. The project will involve rehabilitating both the existing sidewalk and roadway and is anticipated to involve the removal of existing features, (sidewalks, curbing, deteriorated mortar rubble masonry wall); grading or modifying side slopes; installing curbing; replacing or modifying existing drainage pipes and structures as needed; reconstructing roadway shoulders; providing safe ADA compliant crossings; potential limited tree clearing (where they conflict with proposed work); and utility relocations (by others). The project does not include any work for the bridge crossing the Mohawk River. All questions about the meaning or intent of the Bidding Documents are to be directed in writing or email to the ENGINEER: CMA Engineers, Inc. 1 Sundial Avenue Suite 510N Manchester, NH 03103 Attention: Jason Beaudet, P.E. Email: jbeaudet@cmaengineers.com Disadvantaged Business Enterprises will be afforded full opportunity to submit bids in response to this advertisement. No contractor will be discriminated against on grounds of race, sex, religion, color, or national origin. Bidders will be required to furnish a bid bond in the amount of 5% of the total bid, and the successful bidder will be required to furnish a Performance Bond and a Payment Bond each in the amount of 100% of the Contract Price. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. RFI due Friday, October 17, 2025 Interpretations or clarifications considered necessary by the ENGINEER in response to such questions will be issued by Addenda delivered to all parties recorded by CMA Engineers, Inc. as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered Plans and Contract Documents can be obtained by emailing Victoria Tarbell at VTarbell@cmaengineers.com. The project includes: Reconstructing the Main Street sidewalks and approximately 2,700 feet of Main Street roadway in downtown Colebrook, from approximately South Main Street to the Beaver Brook bridge. The opinion of cost for the project is approximately $5,300,000 to $6,500,000. The project does not include any work for the bridge crossing the Mohawk River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$6,237,382.00

Public - City

Paving, Site Work

67

11

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
53
Bidding Soon
593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.