Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Prince Edward, Ontario. Completed plans call for the renovation of a playground / park / athletic field.
This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested respondents; the second phase (Phase Two) will invite the qualified respondents to provide a financial bid on the project based on the specifications and drawings. The qualification list will expire upon award of a contract in Phase Two and the prequalification list will not be used in any other solicitation. Renovation and expansion of the Vancott Cottage Prince Edward Point National Wildlife Area (PEPNWA) located on federal land and subject to federal regulations. The Contractor shall successfully obtain all required permits and provide all necessary labour, materials, and equipment required to complete the renovation and expansion of the Vancott Cottage Prince Edward Point National Wildlife Area, located in Milford, Ontario K0K 2P0 as outlined in the engineering specifications and drawings that will be released to those qualified to complete Phase 2. There will be a mandatory site visit during the second phase of the tender. To assist with bonding and insurance requirements, this project is estimated to cost approximately between $450,000.00 and $550,000.00 (taxes excluded). The estimated contract period will be 2 month(s), with a proposed start date of 2024/12/23. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Playgrounds / Parks / Athletic Fields
$550,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2024
December 23, 2024
6056 Long Point Rd, Prince Edward, ON
Related To This Project
Prince Edward, ON
Bid Date: Dec 05 2024
Prince Edward, ON
--
Prince Edward, ON
Bid Date: Nov 07 2024
Prince Edward, ON
Bid Date: Oct 01 2024
Prince Edward, ON
--
Prince Edward, ON
Bid Date: Sep 10 2024
Prince Edward, ON
Bid Date: Sep 12 2024
Prince Edward, ON
Bid Date: Sep 03 2024
Prince Edward, ON
Bid Date: Sep 03 2024
Prince Edward, ON
Bid Date: Aug 29 2024
Prince Edward, ON
--
Prince Edward, ON
Bid Date: Aug 20 2024
Prince Edward, ON
--
Prince Edward, ON
--
Prince Edward, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.