Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in El Paso, Texas. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Located on university-owned property on the campus of The University of Texas at El Paso, this Project will provide housing and support amenities for incoming freshmen. The site of the new residence hall will be the north side of Kidd Field as set out in the 2024 Campus Masterplan (available on UTEP's website). The existing stadium seating in this area will be demolished as part of the project. Consisting of single and double occupancy rooms configured in pods with suitestyle bathrooms, the 225-250 bed co-ed dormitory style student housing complex will be economical in nature and will have a 30-year life span. This project will also include a dining hall with associated kitchen that will accommodate the 225-250 student residents (mandatory mealplan), plus a portion of the approximately 425 residents at the neighboring Miner Village Student Housing facility. The kitchen equipment will be included in the CCL. Site planning efforts should accommodate an additional similarly styled 225-250 future dormitory, proportional dining hall/kitchen with capacity to meet the needs of the future dormitory and structured parking. Permanent parking for the Project is assumed to be provided within the existing campus parking capacity. The exterior of the building will reflect UTEP's Bhutanese style and campus building colors but will be designed to be a cost-effective housing option for students. The Owner will require the CMAR to price several options during the Definition Phase of the Project which is inclusive of OPR, Program, and Schematic Design. Options may include but may not be limited to precast concrete, light gauge metal, wood structural systems, other structural options, UT design guidelines, and systems more in line with typical multifamily construction, other system solutions, adjustment of room mix to include multi-occupant apartments, etc. This process may require early Life Cycle Costs Analysis (LCCA) to aid the Owner in the decision-making process. In addition, this Project shall provide for indoor and outdoor community amenities. These may include, but are not limited to flex space, lounge, laundry, group study areas, group living spaces, conference spaces, and exterior gathering areas. General site improvements include irrigated landscaping, roads, drives, fire lanes, potential for expansion of and connection to campus utility infrastructure. The Total Project Cost (TPC) for this project is $62,700,000. The TPC includes a Construction Cost Limitation (CCL) of $40,365,750 for new construction of the Student Housing Complex. Anticipated Issue for Construction "Make Ready" packages include demolition, site preparation, infrastructure improvements, and below-grade/at-grade structural systems. All remaining Issue for Construction Documents will be referenced as "Project Completion".
GC Bidding
Educational
$62,700,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
45
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2024
March 17, 2026
500 W University Ave, El Paso, TX
Related To This Project
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
--
El Paso, TX
Bid Date: Oct 24 2024
El Paso, TX
Bid Date: Dec 04 2024
El Paso, TX
Bid Date: Nov 21 2024
El Paso, TX
Bid Date: Dec 03 2024
El Paso, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.