BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work and new construction of a pre-engineered storage facility in Clinton, South Carolina. Conceptual plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of November 4, 2025, this project has been cancelled. no bids have gone out. Request for Proposals to build pole building shelters for the Clinton High School Athletic Department. Qualified contractor must provide engineered drawings based on existing site condition needs and full construction materials & services. Construction Cost Range: $150,000

Project Abandoned

Warehouse / Distribution - Pre-Engineered Storage Building

$150,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
119
Bidding Soon
1,691
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2024

February 9, 2026

Project location map

18132 SC-72, Clinton, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.