Published December 19, 2024 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in Buckingham, Pennsylvania. Completed plans call for site work for a water / sewer project; and for the renovation of a municipal facility.

Work includes demolition of existing equipment (piping, wells, pressure tanks, and ancillary equipment) inside the existing Fieldstone Water System Control Building, rehab of existing building including new concrete floors, roof, siding etc., installation of new booster skid and associated piping and equipment, rework of existing electrical distribution equipment to support new skid, and approximately 1000 lf of 12" DIP suction piping from main. The bid must include all costs incidental to the work of the Project. Products shall be prequalified as "equals" for use on this project as is described by the Information to Bidders. Bidder shall meet the standards set forth in the Instructions to Bidders. Bids may not be modified, withdrawn or canceled within a period of 60 days following the date for receipt of bids without the prior written consent of Buckingham Township. Buckingham Township reserves the right to waive any informalities, irregularities, defects, errors or omissions in any or all bids and to reject any or all bids. Doc Notes: Bidding Documents may be examined at Buckingham Township and at Castle Valley Consultants, Inc., 10 Beulah Road, New Britain, PA, 18901 weekdays between 8:30 a.m. and 4:00 p.m.

Award

Municipal

$1,746,170.00

Public - City

Renovation, Site Work

34

26

13

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Operation Data, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies, Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Castings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Bowls, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Planting Preparation, Landscape Grading, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
520
Active Projects
281
Bidding Soon
4,698
All Active Projects
2,094
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 27, 2025

img_map_placeholder

To Be Determined, Buckingham, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cold Spring / Fieldstone Water Interconnect - General

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.