BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a civil project in Lake Andes, South Dakota. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The scope of this project includes CMAR services only for the building addition, and not any portion of the pipeline itself. Construction Manager at Risk Services for The Project consists of Construction Administration and Quality Control, and total Construction Execution of all associated components necessary to complete the design and construction of the Platte treatment plant expansion project. The Construction Manager at Risk Procurement Process will be executed by a two-step selection method as described by the RFP. Proposals will first be reviewed based on the criteria outlined in the RFP and then a selected short list of Proposers may be further solicited into an interview process if RCWD feels it is necessary to have formal interviews. The final preferred Proposer for CMAR Services will be selected on qualifications plus best-value-based criteria. RFP submitters are advised and shall be prepared to, upon being selected short list RFP recipient, propose services to be performed in compliance with current state and federal programs such as but not limited to: South Dakota Department of Agriculture and Natural Resources State Revolving Fund (SDDANR SRF), American Rescue Plan Act (ARPA), Equal Employment Opportunity (EEO), Minority-Owned Business Enterprise (MBE) obligations, Women-Owned Business Enterprise (WBE) obligations, Davis-Bacon Wage Rates, and American Iron and Steel (AIS). Additional program obligations and regulations will be described by RFP.Furthermore, RFP submitters are advised and shall be prepared to provide all licenses to perform construction in the State of South Dakota. The Proposing team shall be in good business standings with local, state, and federal governments. Complete requirements for proof of business standing and licensure for CMAR Services will be described by the RFP. Furthermore, RFP submitters are advised and shall be prepared to provide all licenses to perform construction in the State of South Dakota. The Proposing team shall be in good business standings with local, state, and federal governments. Complete requirements for proof of business standing and licensure for CMAR Services will be described by the RFP.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Addition, Demolition, New Construction, Site Work

38

4

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
67
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2024

March 11, 2025

img_map_placeholder

To Be Determined, Lake Andes, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.