EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2025 at 7:00 PM

Updated January 25, 2025

Renovation of a transportation facility in Louisville, Kentucky. Completed plans call for the renovation of a transportation facility.

**Per Addendum 1 the bid date has been changed from 12/16/24to 12/12/24** Construction of Bus Fleet Charging Infrastructure and Related Improvements Your company is hereby invited to submit to TARC, Procurement Department, a proposal for such solution. The overall objective is for TARC to select a Contractor or Contractors for such service solutions as described in Section 3 Scope of Work and Services and all Exhibits. TARC intends to execute an agreement with the most qualified Contractor(s) that present an economically viable proposal. To that end, TARC supports and encourages the formation of teams that maximize the qualifications of the proposers in all aspects. The composition of the proposers team or team configuration shall be clearly defined and stated within the proposal. The Contractor(s) shall be selected according to the Best Value as determined by an Evaluation and Selection Committee Question Deadline 11/28/2024 at 12:00 PM ET Cut-Off for Technical Questions If interpretations, specifications, or other changes to the solicitation are required as a result of the meeting, TARC will post any addenda to TARC Bonfire Portal If you have any questions regarding the specifics of this solicitation or any additional questions about TARC or Procurement Department policies and procedures, please contact Maria Harris at MHarris@ridetarc.org

Award

Transportation Terminals

$3,000,000.00

Public - City

Renovation

14

17

10

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cutting and Patching, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
43
Bidding Soon
1,015
All Active Projects
400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

img_map_placeholder

To Be Determined, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.