BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a transportation facility in Pensacola, Florida. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

The City of Pensacola is requesting sealed statements of interest and qualifications from professional firms experienced in in Professional Construction Management at Risk Services for the construction of the Terminal Building Expansion Project at Pensacola International Airport. SCOPE OF WORK It is the intent of this solicitation to select a construction management firm to provide preconstruction and at-risk construction management services for the construction of the Terminal Building Expansion Project at Pensacola International Airport. The Airport seeks to construct a new Security Screening Check Point, new Concourse, and associated airfield and landside civil engineering projects to connect the new facility to existing infrastructure. Work will include various activities conducted within the Security Identification Display Area and the Sterile areas of the Airport, and the construction management firm will be required to meet clearance requirements of the Transportation Security Administration to obtain and maintain Airport badges. The OUTER FACE of the sealed submittal package shall identify the respondent, the RFQ title, and the RFQ number (whether hand-delivered, mailed, or via UPS/FedEx or other courier service). Submittals received after the closing time will not be accepted. Multiple submittals from the same entity will not be accepted. After the submittal deadline those submittals received will be opened and publicly acknowledged. Interested parties may attend. The City of Pensacola adheres to the Americans with Disabilities Act and will make reasonable accommodations for access to City services, programs, and activities. Please email ADACoordinator@cityofpensacola.com or call (850) 436-5600. Requests must be made at least 48 hours in advance of the event in order to allow the City time to provide the requested services. The City reserves the right to accept or reject any or all submittals, to waive any submittal informalities and to re-advertise for submittals when deemed in the best interest of the City. Late submittals will not be accepted December 20, 2024 Distribution of Materials for Review January 10, 2024, 1:00 p.m. Pensacola International Airport Administrative Office, Suite 225, 2430 Airport Boulevard, Pensacola, Florida Evaluation Committee Meeting Ranking / Shortlisting Qualifications January 30, 2025, 9:00 a.m. Pensacola International Airport Administrative Office, Suite 225, 2430 Airport Boulevard, Pensacola, Florida Evaluation Committee Meeting Oral Presentations Recommendation of Contract Award Design A design team headed by EXP US Services, Inc. and Luis Vidal + Architects (together referred to as Design Team) was selected to design the Terminal Building Expansion Project via a Request for Qualifications process in accordance with City, State, and Federal procurement requirements and is currently working on the design of Security Screening Checkpoint and the Concourse. Project Funding and Ancillary Projects This project is anticipated to be funded through a number of grants agencies, potentially including the State of Florida, the Federal Aviation Administration, and others. The CMAR must adhere to all grant requirements, potentially including pay scales and documentation that comply with the Davis Bacon Act. Total anticipated funding available for the Project construction activities is $95,000,000. This includes all costs and fees associated with construction, including permitting, commissioning, CEI services, etc. This funding may vary significantly, depending on final design and available funding. Schedule It is anticipated that the Design Team will complete a Statement of Probable Cost in October 2024. Concurrently, the Design Team is developing a Security Screening Checkpoint design that is envisioned for construction to begin in June 2025, with completion in June 2026. Construction of the Concourse is currently anticipated to begin in January 2026, with completion in January 2027 Question Deadline 11/22/2024 at 10:00 AM CT Any questions concerning the RFQ should be addressed and submitted in writing, to: Dedria Lunderman, Purchasing Manager City Hall 6th Floor 222 West Main Street Pensacola, Florida 32502 purchasing@cityofpensacola.com

GC Bidding

Transportation Terminals

$95,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

3

3

22

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
27
Bidding Soon
446
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

January 1, 2026

img_map_placeholder

2430 Airport Blvd, Pensacola, FL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.