EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2024 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and renovation of a mixed-use development in Kane, Pennsylvania. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; for the renovation of a playground / park / athletic field; road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The U.S. Army Corps of Engineers, Pittsburgh District, has a project located at Allegheny National Forest, McKean and Warren County, PA for Recreational Area Development Phase II.The major features of the Project generally involves the following:a. Renovation of three existing buildings (O-1, U-1, and U-2)o Providing interior construction including wall boards, toilet partitions, electrical fixtures, plumbing, sanitary lines, and domestic water lines.o Utility improvementso Access pathways from adjacent roadways and parking lotsb. Demolition of two existing buildings (O-2 and Shower Building)o Buildings will be demolished in their entirety.o Construction of new prefabricated buildings.o Access pathways from adjacent roadways and parking lotsThe work is to be performed entirely on property of the Allegheny National Forest. The NAICS Code for this acquisition is 236220 Commercial and Institutional Building Construction. The Small Business Size Standard for this NAICS Code is $45,000,000.00. This requirement is 100% Set-Aside for Small Business concerns. Any resultant contract shall be Firm-Fixed Price and one award is anticipated.Offerors must have a current and active registration in the System for Award Management (SAM) at the time of quote submission in order to be awarded a contract. Quotes from offerors not registered in SAM will not be considered. The SAM registration process may be accessed at the following link: https://www.sam.gov. Registration is FREE to all vendors. PLEASE ensure your annual SAM registration is current. If it has expired or will expire soon, PLEASE START THE RENEWAL PROCESS TODAY if you intend to submit a quote.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. 2 October 2024 - Amendment 0001 issued to remove Attachment 3 Design Analysis - Kiasutha Recreational Area Redevelopment Phase 2, as it is not a Contract document. DO NOT use Attachment 3. 9 October 2024 - Organized Pre-Bid Site Visit conducted; contracting discussion and sign in sheet attached. Questions are due 11:00AM ET, 16 October 2024, via ProjNet. To submit and review Bid Inquiry Items, Bidders will need to be a current registered user or self-register into the ProjNet system. No question will be received by e-mail. The ability to enter technical inquiries and questions relating to this Invitation for Bid (IFB) will be disabled on 11:00AM ET, 16 October 2024. No Government responses will be entered into the ProjNet system after 23 October 2024. Magnitude of Construction is Betw een $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (6.3%), WBE (6.9%), SBE (100%) Those planning to attend the site visit shall provide an email confirmation to Aaron.M.Barr@usace.army.mil by 7 October 2024. The Kiasutha Campground project consists of several features of work. The Base Contract work consists of the following work tasks and activities: a. Renovation of three (3) existing buildings (U-1,U-2, and O-1). b. Installation of one (1) new prefabricated showerhouse. AWARDABLE OPTION 1 Awardable Option 1 consists of the following work tasks and activities: a. (O-2)Demolition and replacement of one (1) existing restroom facilities with a prefabricated buidling. EXISTING WORK In addition to Section 00 70 00 CONDITIONS OF THE CONTRACT, FAR 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS: a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,445,622.00

Public - Federal

Demolition, Paving, Renovation, Site Work

36

17

18

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Subflooring, Finish Carpentry, Millwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Wood Siding, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers, Canopies
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
487
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 17, 2025

img_map_placeholder

To Be Determined, Kane, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Kiasutha Recreational Area Redevelopment Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.