Published November 26, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Horsham, Pennsylvania. Completed plans call for site work for a water / sewer project.

Dresher Road Streambank Stabilization The project involves restoration of Pennypack Creek's streambank. The north banks shall be cut back and stabilized using bio-engineering techniques and the south banks shall use a combination of geotextile soil wrap and brush mattresses due to the steeper slopes of the upland areas. Native plantings are included. The Contractor is responsible for all erosion control, demolition, grading, installation of stormwater improvements, plantings, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor, and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract. Questions Due Date: Nov 15th 2024, 5:00 PM EST This Section involves the Contractor's obligations relative to maintaining the safe and efficient movement of traffic in the vicinity of construction. Contractor will be required to furnish, erect, and maintain traffic cones, drums, barricades, flashing danger signal lights, directional signs and provide trained and equipped flagmen as required by the Traffic Control Plan and State and local permit requirements to restrict the movement of traffic within the construction areas and to clearly indicate the restrictions well in advance to vehicular traffic. The Work of This Section Includes: 1. Description of Work. 2. Work by Owner. 3. Work by other parties. 4. Owner supplied Products. 5. Contractor use of site. 6. Future work. 7. Work sequence of construction. 8. Owner occupancy. The project involves restoration of Pennypack Creek's streambank. The north banks shall be cut back and stabilized using bio-engineering techniques and the south banks shall use a combination of geotextile soil wrap and brush mattresses due to the steeper slopes of the upland areas. Native plantings are included. The Contractor is responsible for all erosion control, demolition, grading, installation of stormwater improvements, plantings, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor, and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract. The planting of trees, shrubs, ground covers, perennials, and ornamental grasses, with planting soil, topsoil, soil amendments, fertilizer, mulch, planting accessories and maintenance. Excavation, backfill and compaction associated with utility construction, including such related features as protection of adjacent utilities and structures, maintenance and protection of traffic, cutting paved surfaces, support of excavation, control of excavated materials, dewatering, pipe bedding, disposal of excavated materials, rough grading and restoration. Excavation, backfill and compaction associated with construction or installation of structures including such related features as protection of adjacent utilities and structures, support of excavation, control of excavated materials, dewatering, structure bedding, disposal of excavated materials, rough grading and restoration. The Work of This Section Includes, but is not limited to: 1. Placing topsoil 2. Soil conditioning 3. Finish grading 4. Seeding 5. Sodding 6. Maintenance Restore unpaved surfaces to a condition similar to that prior to excavation as specified and indicated on the Drawings. The "Seeding Restoration Table" at the end of this section lists specific seeding restoration requirements. Refer to Drawings for seeding restoration requirements at each specific location of Work.

Bid Results

Water / Sewer

$414,667.00

Public - City

Site Work

13

27

4

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
280
Bidding Soon
4,551
All Active Projects
2,146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

February 1, 2025

img_map_placeholder

Dresher Rd, Horsham, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Dresher Road Streambank Stabilization

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.