BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Site work and outdoor lighting for a playground / park / athletic field in Milledgeville, Georgia. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

Baldwin County Recreation Department would like to install LED fixtures and replace one damaged pole on four of the fields at Walter B. Williams Park. Requires replacing HID fixtures with LED lights and install one 80 foot concrete pole for the fixtures. Baldwin County Recreation Department would like to install LED fixtures and replace one damaged pole on four of the fields at Walter B. Williams Park. Requires replacing HID fixtures with LED lights and install one 80 foot concrete pole for the fixtures. The purpose and scope of this bid is to give Baldwin County Recreation Department the cost and energy savings for installing LED light fixtures on four baseball fields. Scope of Work Baseball Fields o Layout based on 50 Foot Candles (FC) average in the infield and 30 FC average in the outfield. o LED Sports Flood or equivalent o Voltage to be verified before fixtures are ordered. o Air Mesh Control System with Dynamic Scenes or equivalent (must be connected to 120v circuit) o Extension plates will be provided for mounting hardware and fixtures to the crossarms. o Furnish labor and equipment to remove and dispose of 112 existing fixtures. o Replace and haul off damaged pole with one 80' MH concrete direct embedded pole with crossarms for 16 fixtures. o Repair any wiring to impacted poles as needed o Install and aim new fixtures. o Includes using existing poles, arms, branch circuits, and breakers, if possible. o Replace electronics in electrical room o Electronics must be controlled by PC-based computer. o Lighting shall be fully operational by February 28, 2025. All inquiries, questions, etc. concerning the IFB shall be forwarded to County Manager Carlos Tobar via email at ctobar@baldwincountyga.com. All questions must be in writing and must be received by 4:00 P.M. on Friday, November 15, 2024.

Under Construction

Playgrounds / Parks / Athletic Fields

$474,418.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
151
Bidding Soon
1,868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

December 3, 2024

Project location map

59 GA-22, Milledgeville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.