Site work, asbestos abatement, new construction and renovation of a playground / park / athletic field in Kingston, New York. Completed plans call for the renovation of a playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and for asbestos abatement for a playground / park / athletic field.

Individual goals for each contract are listed in notice to bidders. Milestone 1 April 30, 2026 Substantial Completion for the following scope: Administration Building, Maintenance & Operation Building, Swimming Pavilion, Pay Booth All utilities for full operation of the above structures, including, but not limited to: Potable water system Septic system & force main Electrical Communications HVAV/Mechanical, including geothermal system All FF&E (Furniture, Fixtures, and Equipment) for the above structures. Swim crib, floating platform, anchoring system, and all related components for a complete operational swimming facility. Vehicular and pedestrian pavement for all facilities west of the Administration building, inclusive. Milestone 2 May 28, 2027 - Substantial Completion for all remaining work. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 25% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 820 Days after contract approved by the NYS Comptroller's office. The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. RFIs received after this due date and time will not be processed. All RFI's shall be submitted to Trevor Saksa via email: Trevor.Saksa@parks.ny.gov Question Deadline 12/03/2024 at 3:00 PM ET Estimated Range: $9,782,000-$13,234,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$13,096,210.00

Public - State/Provincial

Asbestos Abatement, New Construction, Renovation, Site Work

694

46

186

6

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Roof Panels, Composite Roof Panels, Composite Wall Panels, Siding, Flashing and Sheet Metal, Sheet Metal Roofing, Sheet Metal Flashing and Trim, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Sectional Doors, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Underground Ducts and Raceways for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Slope Protection, Containment Barriers, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Porous Flexible Paving, Rigid Paving, Concrete Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
239
Bidding Soon
2,923
All Active Projects
1,338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

April 19, 2025

img_map_placeholder

100 Sojourner Truth Wy, Kingston, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Comprehensive Facility and Infrastructure Improvements Sojourner Truth State Park - General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.