BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Pueblo, Colorado. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000367027 In general, this project will consist of a Contractor installing a new AR plate and seals for the Secondary Clarifier #1 as outlined in the specifications for this project. This work will include all administration, labor, materials, tools, equipment, and any accessories or parts that may not be specifically mentioned but are necessary to complete the project. (Note: City will supply the new AR plate, Contractor will supply the seals then remove and replace the equipment.) Question Deadline 11/08/2024 at 4:00 PM MT Questions are submitted online No The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. The Wastewater Reclamation Facility (WRF) is soliciting for a qualified Contractor to assist with the replacement of the AR plate in Clarifier #1. Removal of the AR plate will chip and crack the concrete, so the Contractor will also need to repair the cracked concrete during the AR plate replacement. (Seals will not be reused and must be provided/installed by the Contractor during the AR plate replacement.) . In general, this project will consist of a Contractor installing a new AR plate and seals for the Secondary Clarifier #1. This work will include all administration, labor, materials, tools, equipment, and any accessories or parts that may not be specifically mentioned but are necessary to complete the project. 1. City will supply the new AR plate. 2. Contractor will supply the seals then remove and replace the equipment (including the City provided new AR Plate). B. Contractor shall provide all hardware, grout, silicone or fastening hardware, parts, equipment, supplies, components, connectors, materials, scaffolding, lift, tools, etc. to complete all removal, replacement, and installation. C. City will supply the Contractor with the estimated delivery date of the new AR plate. A. Contractor must order seals and other necessary materials from a vendor acceptable to the City. (Note: Contractor is not ordering new AR plate.) B. Contractor shall begin work on site within ten (10) business days from notification to begin (to be issued after equipment has been received by the City) C. Contractor shall perform the following steps to complete the work for this project. Any details that have been left out, but are clearly necessary to complete the work, shall be assumed by the Contractor and included in bid amount. 1. Clarifier shall be down and clean before Contractor will be able to enter the Clarifier by the City. a. Clarifier may still have some debris in the bottom of the Clarifier but should not interfere with the Contractors ability to care out any task in the project. 2. Disconnect electrical service to units; will be performed by City if licensed electrician is required. 3. Prepare for installation of the AR plate and any additional items for the system including hardware, parts, equipment, supplies, components, connectors, etc. 4. Block and support the clarifier arms before removing any parts. 5. Contractor to remove existing seals from around clarifier center column, saving the seals for stock for the Wastewater Reclamation Facility (WRF). 6. Remove a section suction arm to allow access to the suction manifold. 7. Remove the suction manifold to allow access to the AR plate. 8. Remove the existing AR plate. 9. Install the new AR plate. 10. Grout the new AR plate with non-shrinking grout. 11. Reinstall the suction manifold. 12. Reinstall suction arm. 13. Install new seals to manufacturer's specifications (Ovivo). 14. Review all work with City's Project Manager. 15. Reconnect electrical service to unit; will be performed by City if licensed electrician is required. 16. Coordinate with the City's Project Manager to complete a test run to ensure the balance is still with in specification (Ovivo). D. Contractor shall maintain site in a clean and safe manner as this is an operational working wastewater treatment facility.

GC Bidding

Water / Sewer

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
204
All Active Projects
93
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

1300 S Queens Ave, Pueblo, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.