Site work for a water / sewer project in Smithfield, North Carolina. Completed plans call for site work for a water / sewer project.

Question Deadline 11/28/2024-Questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions may be faxed or e-mailed. Questions will not be taken by phone. Engineer's fax number is 1-919-834-3589. E-mail address is bjohnson@thewootencompany.com. Questions received less than five working days prior to the date for opening of Bids may not be answered. A Pre-Bid Meeting will be held as provided in the Instructions to Bidders. After Bids are opened, the Owner shall evaluate them in accordance with the methods and criteria set forth in the Instructions to Bidders. The Owner reserves the right to waive any informality or to reject any or all Bids. Unless all Bids are rejected, Award will be made to the lowest responsible Bidder, taking into consideration quality, performance and the time specified in the proposals for the performance of the Contract. Note: List the major items of the Project below. See examples at the end of this Section: The Project consists of the following major items: Replacement of approximately 6,300 LF of 12-inch gravity sewer with 24-inch gravity sewer. Bidding Documents may be examined at Engineer's and Owner's office and at: Note: Edit the offices that bidding documents will sent to for the following organizations. Bid documents should be sent to the Minority Plan rooms when "Good Faith Efforts" are required. Note that effective 3/31/12 AGC offices in NC have closed but plan/specs still available online. Plan rooms are online only, confirm with client if they wish to post documents on their website or any other sites not listed below. Typical project setup should be for a non-refundable fee as opposed to a refundable deposit. Change as necessary if other method is desired. Note: Use the following non-refundable fees for plan sets as a guide: a. Less than 10 plan sheets, small set of specs.: $50.00 b. 10-25 plan sheets, medium set of specs.: $100.00 c. 25-50 plan sheets, medium set of specs.: $200.00 d. 50-75 plan sheets, large set of specs: $300.00 The Bidding Documents will be shipped UPS ground. This fee will include registration and access to the Issuing Office Project Bidding site for electronic download of Bidding Documents as PDF Files. Note: Provide specific license requirements in the Information for Bidders. Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87 and the Instructions to Bidders. Bid Security in the amount of five percent of the Bid must accompany each Bid and shall be subject to the conditions provided in the Instructions to Bidders. Note: The following paragraph is required for EDA funded Projects: The U.S. Department of Commerce, Economic Development Administration is providing partial funding ($3,200,000) for this project (EDA Investment No. 04-79-07753). Bidders must comply with the EDA "Supplemental General Conditions" and additional instructions included in the project bid documents/specifications. Owner is an Equal Opportunity Employer and does not discriminate. Small, minority and woman's businesses and labor surplus area firms are encouraged to submit bids.

Award

Water / Sewer

$3,669,462.00

Public - City

Site Work

15

9

2

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Scour Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
60
Bidding Soon
1,135
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 3, 2025

img_map_placeholder

Multiple Locations, Smithfield, NC

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

W. Smithfield Sanitary Sewer Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.