Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a bridge / tunnel in Hillsborough, New Jersey. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Re-Advertisement of Bridge Preventive Maintenance Contract 2023-1, Forty-Seven (47) Bridges; Routes I-78 and NJ 31; Hunterdon, Somerset and Warren Counties INQUIRIES REGARDING THE PROJECT PART (2) IS CHANGED TO: 2. After Award of Contract. Submit all inquiries to the RE through the following: Mr. Jackie Yiu, Division Director Operations Support & Engineering 1035 Parkway Avenue, P.O. Box 607 Trenton, NJ 08625 Telephone: (609) 963-1263 x5958 Estimated Range between $10,000,001 to $20,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 4, 4b or 5 The Principal Items of Work Consist of: 15,000.00 Sf Concrete Deck Repair, Type B 8,000.00 Sf Substructure Concrete Repair 6,110.00 Lf Bridge Header Repair 10,500.00 Lf Deck Joint Reseal (Silicon) 11,500.00 Lf Deck Joint Repair 7,410.00 Sy Vertical Concrete Sealant Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d) Minimum wage rates for this project shall be as specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on file with this Department. The attention of bidders is directed to the provisions covering subletting or assigning the contract to Section 108-Prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 477 - Bridge Preventive Maintenance Contract 2023-1 - Routes I-78 and NJ 31 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$9,696,924.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2026
July 6, 2026
Multiple Locations, Hillsborough, NJ
Related To This Project
Hillsborough, NJ
Bid Date: Nov 26 2024
Hillsborough, NJ
--
Hillsborough, NJ
Bid Date: Dec 11 2024
Hillsborough, NJ
Bid Date: Jan 09 2025
Hillsborough, NJ
Bid Date: Jan 15 2025
Hillsborough, NJ
--
Hillsborough, NJ
Bid Date: Jan 05 2021
Hillsborough, NJ
--
Hillsborough, NJ
Bid Date: Nov 06 2024
Hillsborough, NJ
Bid Date: Nov 20 2024
Hillsborough, NJ
Bid Date: Oct 24 2024
Hillsborough, NJ
Bid Date: Sep 04 2024
Hillsborough, NJ
Bid Date: Oct 22 2024
Hillsborough, NJ
Bid Date: Jul 24 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
