BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a municipal facility in Calgary, Alberta. Design plans call for site work for a municipal facility.

Design and construction of vertical and horizontal Landfill Gas (LFG) collection systems at three (3) waste management facilities (WMF) and our four (4) closed landfill sites for the next five (5) years. TIMELINE: Request for Proposals from consultants has been awarded. Scope of work includes Design and construction/contract management services. The services include but are not limited to the following two (2) project categories: Category A: Design, tender and construction management support for horizontal landfill gas collection systems at all three (3) active WMFs and four (4) closed landfill sites. Category B: Design, tender and construction management support for vertical landfill gas collection systems at at all three (3) active WMFs and four (4) closed landfill sites. The intention is to enter into Agreements with two (2) legal entities. Further update may be available late 2025.

Design

Municipal

$4,000,000.00

Public - City

Site Work

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
23
Bidding Soon
556
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2026

Project location map

Multiple Locations, Calgary, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.