BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Homer Glen, Illinois. Completed plans call for the renovation of a municipal facility.

Roofing Demolition: a. Remove all existing panel fasteners and discard. b. Remove foam closure at ridge and discard. c. Remove existing flexible flashing boots at pipe penetrations and discard. d. Remove sheet metal fascia at rake edges and discard. Roofing Installation a. Powerwash entire roof surface as required by coating manufacturer. b. Apply primer to roof surface. c. Treat surface corrosion with rust inhibitive primer. d. Install new screw fasteners at all locations where existing fasteners were removed. Enhance fastening at eaves as shown in the drawings. e. Apply flashing grade sealant at all fasteners. f. Apply flashing grade sealant at all horizontal and vertical panel overlaps as shown in drawings. g. Install new fascia metal at rake edges. h. Install new flexible flashing boots at all pipe penetrations. i. Replace roof panel sections where shown on drawings. j. Apply coating base coat and top coat consisting of two differing colors. Each application should be minimum 17 mils dry film thickness (DFT). Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond from a company with an A-1 best rating, or a cashier's check in the amount of ten percent (10%) of the total amount of the proposal and made payable to the Village of Homer Glen, 14240 W. 151st Street, Homer Glen, IL 60491. No bid shall be withdrawn for a period of ninety days (90) days after the bid opening date without the consent of the Village. Checks or drafts of unsuccessful bidders will be returned as soon as possible after opening and checking the bids. Successful bidder must provide proper insurance acceptable to the Village. Each contractor is to submit their bid as indicated in the Specifications and include all signed supporting documents. Award of Contract: The Village reserves the right to reject any or all bids and to waive any informality in bidding. The Village of Homer Glen Board of Trustees will make the final award of the proposal. The successful bidder and the Village will execute a contract mutually agreeable to both parties within 10 days from the award of the contract.

Post-Bid

Municipal

$200,000.00

Public - City

Renovation

6

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
83
Bidding Soon
1,693
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

April 1, 2025

img_map_placeholder

14400 W 151st St, Homer Glen, IL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.