Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Site work and paving for a road / highway in Indianapolis, Indiana. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://fox59.com/indiana-news/i-65-on-south-side-expanding-to-4-lanes-in-each-direction-to-relieve-congestion/ I-65 on south side expanding to 4 lanes in each direction to relieve congestion INDIANAPOLIS — Construction will begin later this spring on a 5-mile stretch of I-65 between I-465 and the south split as the Indiana Department of Transportation (INDOT) tries to relieve congestion during peak travel times. The agency plans to do that by adding an additional lane on both sides of the interstate, bumping each up from three lanes to four. From Keystone Avenue to Raymond Street, contractors will widen the interstate using the existing inside shoulder while the expansion will happen on the outside shoulder from I-465 to Keystone. When construction begins this year, the interstate will be reduced to two lanes with a few full closures on the weekends. The dates of those closures haven’t been finalized. That expansion will extend into the south split with INDOT adding an extra lane onto the ramp that continues on I-65. That additional lane will end at the Washington Street exit. INDOT will also expand the bridges along the interstate to accommodate the additional lane. As part of those improvements, the agency will build new sidewalks either under or over the interstate. “While we’re in the area, we wanted to make those improvements,” Natalie Garrett with INDOT said. “Allowing for improved pedestrian travel in and around the area and the communities that surround I-65.” One of the bridges getting some major rehab is the Morris/Prospect Street bridge that runs over I-65. That section of the street will be closed for 30 days as INDOT expands the sidewalk. An exact date for the closure hasn’t been announced. The longest and most disruptive closure will be the Hanna Avenue bridge, which will be closed for an entire year. The bridge is being fully reconstructed, and sidewalks will be added on both sides. I-65 Lane Expansion Additional lane into South Split Hanna Avenue Bridge INDOT said the improvements will extend the life of the aging interstate, which was constructed decades ago. Studies are ongoing about how to modernize the interstate inside the I-465 loop, but for now, the agency is maintaining the current infrastructure. “That is the goal. A safer, smoother commute for those that travel on I-65,” Garrett said. You can find more information on the project here. ---------------------------------------------------------------------------------------- Location: From 2.91 mi. N. (CR 400 N) of SR 14 to 0.56 mi. S. of SR 10 Miles : 5.767 District: LaPorte As of October 13 , 2025, the project is in Conceptual status. Anticipated letting Year is 2028. INDOT - HMA Overlay Minor Structural - I 65 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$21,617,414.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2028
I-65, Indianapolis, IN
Related To This Project
Indianapolis, IN
Bid Date: Nov 22 2024
Indianapolis, IN
Bid Date: Nov 19 2024
Indianapolis, IN
Bid Date: Nov 01 2024
Indianapolis, IN
Bid Date: Nov 07 2024
Indianapolis, IN
Bid Date: Dec 04 2024
Indianapolis, IN
Bid Date: Dec 04 2024
Indianapolis, IN
Bid Date: Nov 21 2024
Indianapolis, IN
Bid Date: Nov 14 2024
Indianapolis, IN
Bid Date: Dec 05 2024
Indianapolis, IN
Bid Date: Nov 22 2024
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Oct 30 2024
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Nov 21 2024
Indianapolis, IN
Bid Date: Nov 25 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
