BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated January 22, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

As of January 21, 2024 Project was awarded to Dimas Bros. Construction in the amount of 2,119,810.35. Scotts Bend Sec 8 WS&D Question Deadline 11/19/2024 In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. b. Necessary replies will be issued to bidders of record as addenda, which becomes a part of the bidding instruments. Oral instructions do not form a part of the bidding instruments. c. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding. UNIT B: WATER DISTRIBUTION SYSTEM - 6-inch C-900 AWWA (DR18) Class 235, waterline (including fittings, bedding, backfill and testing), 6-inch C-900 restrained joint waterline (including fittings, bedding, backfill, and testing) 8-inch C-900 AWWA (DR18) Class 235, waterline (including fittings, bedding, backfill and testing), Flushing valve, bury as shown, (including lead and gate valve), 6" gate valve and box, bury UNIT C: SANITARY SEWER SYSTEM - 8-inch sanitary sewer pipe, all depth, including air testing, mandrel testing, bedding and backfill), Sanitary sewer manhole, standard depth Single or double near side 4-inch sanitary sewer leads (including single 4-inch sanitary sewer cleanouts, wye and plugs), Single or double near side 4-inch sanitary sewer leads with 18' segment of C900 AWWA (DR18) Class 235 centered over water line crossing (including single 4- inch sanitary sewer cleanouts, wye and plugs), 8-inch sanitary sewer plug, complete in place Remove 8-inch plug to connect proposed 8-inch sanitary sewer to existing 8-inch sanitary sewer UNIT D: DRAINAGE SYSTEM - 24-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), 24-inch RCP, ASTM C-76, Class IV, all depths, (including bedding and backfill) 36-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), Type "C" manhole for 24"-42" pipe, standard depth, HARRIS COUNTY FLOOD CONTROL PROJECT NO. 2408150236

Award

Water / Sewer

$2,119,810.00

Public - County

Site Work

40

19

13

4

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
61
Bidding Soon
3,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

December 23, 2024

Project location map

To Be Determined, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.