Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 27, 2024 at 7:00 PM
Updated November 28, 2024
Renovation of a military facility in Lincoln, Massachusetts. Completed plans call for the renovation of a military facility.
Devens CSMS Light and Fixture Replacement [MA National Guard] Furnish and install all new LED lights throughout the CSMS, replacing the existing fluorescent bulbs and fixtures with LED bulbs and LED compatible fixtures in the building. The existing lights throughout the Combine Support Maintenance Shop (CSMS) are outdated, inefficient, florescent light bulbs and non-LED compatible fixtures in need of replacement. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Post-Bid
Military
$150,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
December 16, 2024
To Be Determined, Lincoln, MA
Related To This Project
Lincoln, MA
Bid Date: Dec 20 2024
Lincoln, MA
Bid Date: Dec 27 2024
Lincoln, MA
Bid Date: Apr 09 2025
Lincoln, MA
Bid Date: Dec 16 2024
Lincoln, MA
Bid Date: Jan 22 2025
Lincoln, MA
Bid Date: Jan 17 2025
Lincoln, MA
Bid Date: Jan 10 2025
Lincoln, MA
Bid Date: Nov 21 2024
Lincoln, MA
Bid Date: Oct 09 2024
Lincoln, MA
Bid Date: Sep 24 2024
Lincoln, MA
Bid Date: Aug 21 2024
Lincoln, MA
Bid Date: Jun 11 2024
Lincoln, MA
Bid Date: May 22 2024
Lincoln, MA
Bid Date: May 08 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
