BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2025 at 8:00 PM

Updated March 13, 2025

Renovation of a mixed-use development in Dayton, Ohio. Completed plans call for the renovation of a laboratory facility.

507354, ZHTV210818 The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue Request for Proposal (RFP) W912QR25R0015 to renovate 8,400 square feet across multiple laboratories in Facility 20071 to expand interior space, upgrade security, and modernize research space. The project includes construction of second floor areas in 1,2,6 & 7 STANDs. Existing machine shop equipment presently located in 2-STAND will be relocated to 7 STAND. Renovation of 6 & 7 STANDs includes removal/repair of concrete floors and installation of new vibration-isolated floors slabs in 7-STAND. STAND = A research cell within a building and is the name used to differentiate between the respective labs/cells. The mechanical support space located between 6 & 7 STANDs will be renovated to include the additional of new restrooms on the first floor and administrative space on the second floor. The second floor area will be extended to connect with the northern exterior wall. Upgrades to 6 & 7 STANDs includes installation of new HVAC and roof repairs. Renovations also include upgrades to 1 & 2 STANDs and 6 & 7 STANDs as Special Access Program (SAP) areas in compliance with ICD 705 standards, including installation of Intrusion Detection Systems (IDS) and Access Control Systems (ACS). To minimize the impact on operations, Building 71 will be renovated in two phases. Part 1 will include demolition and renovation of the 6 & 7 STANDs.and the 6-STAND administrative space shall be construction as a secure space with a single perimeter. Part 2 will include demolition and renovation of 1 & 2 STANDs, the 1-STAND administrative space, the 2-STAND administrative space, and a new security office space in 3-STAND. These areas shall also be constructed as a secure space with a single SAP perimeter. The new SAP perimeter shall combine with the existing SAP perimeter, which includes 3 & 4 STANDs. Part 2 work may not begin until after Part 1 has been completed, turned over to the government, and the government has moved out of 1 & 2 STANDs. The Contract Duration is estimated at eight hundred forty (840) calendar days from Contract Notice to Proceed. The actual Period of Performance will be identified in the solicitation. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed- Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be a 100% total Small Business set-aside competitive procurement. SELECTION PROCESS: The proposals will be evaluated using a Single-Phase Best Value Tradeoff source selection. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $10,000,000 and $25,000,000 in accordance with DFARS 236.204. The target ceiling for contract award is $11,000,000 based on the funds made available for this project. The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$13,441,400.00

Public - Federal

Renovation

324

35

278

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
173
Bidding Soon
2,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2024

January 15, 2025

Project location map

To Be Determined, Dayton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.