Published January 6, 2025 at 7:00 PM

Updated January 24, 2025

Demolition, site work and addition to a water / sewer project in Provincetown, Massachusetts. Completed plans call for the addition of a water / sewer project; for site work for a water / sewer project; and for the demolition of a water / sewer project.

The Town of Provincetown (Awarding Authority), acting through the Department of Public Works (DPW), is seeking technical and price proposals for the New Sewer Design-Build-Operate (DBO) Contract. The project involves the design, construction, and operation of the expanded sewer collection, treatment, and disposal system in accordance with applicable regulations. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Proposer questions shall be submitted no later than December 23, 2024, at 4:00 p.m. Questions received after the above deadline may not be considered by the Awarding Authority. All questions shall be submitted in writing via online Question Deadline 12/23/2024 at 3:00 PM ET All questions shall be submitted in writing to Braden Witt, MCPPO, Senior Project Manager at Provincetown Department of Public Works, 2 Mayflower Street, Provincetown, MA 02657 and via email at bwitt@provincetownma.gov. Question Response Deadline January 6, 2025, 4:00pm Doc Notes: Bonding Documents: Hard copies of all bonding documents must be submitted to the Provincetown DPW in accordance with the proposal submission instructions.

Post-Bid

Water / Sewer

$75,000,000.00

Public - City

Addition, Demolition, Site Work

562

30

5

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
117
Bidding Soon
2,100
All Active Projects
919
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

June 30, 2025

img_map_placeholder

Multiple Locations, Provincetown, MA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

New Sewer Design-Build-Operate (DBO) Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.