Published January 9, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work and new construction of a water / sewer project in Essex Fells, New Jersey. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The work will include but is not limited to soil erosion and sediment control, environmental protection, site work, demolition, construction of a new 700 sf water treatment building, installation of a new 150 GPM PFOA treatment system, process instrumentation and controls, utility coordination, and facility equipment start, testing, commissioning, and training. The contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents. The Contract calls for two (2) substantial completion dates and allows three hundred fifteen (315) calendar days for contract closeout from the issuance of the notice to proceed. Phase 1 will encompass the demolition of the existing building and construction of the new facility, with substantial completion #1 being no later than one hundred fifty-four (154) calendar days. Phase 2 will encompass the installation of the vessels and the treatment process being in service no later than two hundred eighty-five (285) calendar days. The contractor must also comply with the below milestone dates. Milestone Dates: The Contractor is required to meet the following critical project milestones: Project Schedule: Ten (10) days from the Notice to Proceed SED Plan: Ten (10) days from the Notice to Proceed PFAS Vessel Shop Drawing Submission: Forty-two (42) days from the Notice to Proceed Substantial Completion #1: Complete construction of the new building; one hundred fifty-four (154) days from the Notice to Proceed Substantial Completion #2 (Treatment in service): two hundred eighty-five (285) days from the Notice to Proceed Final Completion: three hundred and seven (307) days from the Notice to Proceed Closeout: Three hundred fifteen (315) days from the Notice to Proceed The surrounding property of the Essex Fells Country Club will be in use throughout the project. The contractor will be subject to limited construction activities and heavy golf traffic from May 15, 2025, to October 22, 2025. A certified check or cashier s check made payable to the order of the Borough of Essex Fells, or a duly executed Bid Bond, in the amount of ten percent (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond. The Borough of Essex Fells reserves the right to consider bids for sixty (60) days after their receipt. The right is reserved to waive any informalities, to accept bids which it deems most favorable to the interest of the Borough to make an award on each item separately or as a whole and to accept any Bid or to reject any or all Proposals in accordance with the Specifications and the Bid forms. Question Deadline 11/19/2024 Every request for such interpretation should be asked through the Question and Answer feature for the project via Online and to be given consideration, must be received at least ten (10) business days prior to the date fixed for the opening of bids.

Award

Water / Sewer

$2,184,000.00

Public - City

Demolition, New Construction, Site Work

48

45

7

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Heavy Timber, Heavy Timber Construction, Sheathing, Subflooring, Underlayment, Shop-Fabricated Structural Wood, Shop-Fabricated Wood Trusses, Finish Carpentry, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Tiling, Ceilings, Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment, Integrated Automation Local Control Units, Integrated Automation Remote Control Panels, Integrated Automation Instrumentation and Terminal Devices, Integrated Automation Instrumentation and Terminal Devices for HVAC, Integrated Automation Sensors and Transmitters, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
548
Active Projects
335
Bidding Soon
4,894
All Active Projects
2,212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

January 2, 2025

img_map_placeholder

255 Roseland Ave, Essex Fells, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Country Club PFOA Removal Treatment Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.