BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2025 at 7:00 PM

Updated January 16, 2025

Site work and paving for a mixed-use development in Hermosa Beach, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project proposes to improve stormwater capture at the intersection of Bard Street and Oak Street. Work will include the construction of a new catch basin inlet at the southwest corner of Bard Street and Oak Street that will connect into the existing maintenance access hole north of Pier Ave with a new reinforced concrete pipe. Incidental improvements include trenching and pavement restoration; construction of concrete curb and gutter, sidewalk, and local depression; and replacement of signage and striping. The engineer's cost estimate for the project is $232,000. License requirement is a valid State of California Contractors License Class "A". All sidewalks and access ramps shall be replaced with PCC concrete within 48 hours after removal. Traffic control plans are required as part of this project to maintain uninterrupted safe vehicular and pedestrian traffic throughout the work areas. The duration of the project is 30 working days. Each proposal must be accompanied by a cash deposit, a certified or cashier's check, or a Bidder's bond, made payable to the City of Hermosa Beach, in an amount not less than 10 percent of the total bid submitted. The successful Bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the Contract price, a payment bond in the amount of 100 percent of the Contract price, and a warranty bond all in the attached form satisfactory to the City Attorney. The successful Bidder will also be required to pay the State of California prevailing wage scale as determined by the Department of Industrial Relations, available at online. The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive and responsible Bidder. Please submit any questions related to this bid via Electronically no later than 5pm on Thursday, November 14, 2024.

Award

Water / Sewer

$212,260.00

Public - City

Paving, Site Work

9

8

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
667
Active Projects
291
Bidding Soon
3,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

Project location map

Bard St & Oak St, Hermosa Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.