BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and paving for a mixed-use development in Hermosa Beach, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work for this project generally includes cold milling of existing pavement and construction of asphalt rubber hot mix (ARHM) overlay with select full depth pavement repair as shown on plans; removal and reconstruction of curb ramp, sidewalk, curb, curb and gutter, and cross-gutter at various locations as shown on the plans and all necessary work to complete the work per project plans and specifications. This project includes work along Pier Avenue from Pacific Coast Highway to Hermosa Avenue and Parking Lot "A" in the heart of downtown Hermosa Beach- a vital city thoroughfare. As such, this project shall be completed in distinct and consecutive phases as described in Special Provisions, Section 900-1 and below: Phase 1- Concrete Improvements- Contractor shall complete concrete improvements along Pier Avenue and Parking Lot "A" prior to commencing concrete work at other listed locations. Contractor will be permitted to complete concrete improvements at other listed locations only after completion of Phase 1 and during Phase 2. Phase 2- Contractor shall complete paving rehabilitation of Pier Avenue and Parking Lot "A". Paving along Pier Avenue shall be completed prior to start of paving rehabilitation at Parking Lot "A". Phase 3- Completion of work at other listed locations per plans and specifications. The Contractor is responsible for production and submittal of traffic control plans in accordance with the requirements of the Special Provisions. Traffic control plans shall be considered a construction submittal subject to review by the Engineer. Please submit any questions related to this bid on Planet Bids portal no later than 5pm on Thursday, January 9, 2025 Online Q&A Yes Q&A Deadline 01/09/2025 5:00 PM (PST) The project includes rehabilitating about 2 miles of existing deteriorated asphalt pavement, select full depth dig-outs, new striping/pavement markings, replacement of sidewalks and gutter, construction of ADA curb ramps, and small areas of concrete road repairs. Liquidated Damages 1200 Estimated Bid Value $3,300,000 Project Duration Seventy-five (75) working days Bid Bond 10.00%

Award

Sidewalks / Parking Lot

$3,200,000.00

Public - City

Paving, Site Work

18

8

7

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
197
Bidding Soon
3,748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

March 17, 2025

Project location map

Multiple Locations, Hermosa Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.