BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Wenatchee, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Engineers estimated range of probable cost is $11.5M - $12.5MThis project includes the construction of bridges, approaches and associated site improvements at two locations, one in Wenatchee over BNSF Railway (West Bridge) and one in East Wenatchee over SR28 (East Bridge). The West Bridge will consist of a concrete ramp to Hale Park and to the existing W.T. Clark Pipeline Bridge. A 116' prefabricated steel truss over BNSF rail will connect to a concrete helical ramp to South Columbia Street and Bridge Street. A secondary elevated, pier supported access ramp will spur off the north side of the new west bridge, terminating along the west side of Hale Skatepark. The East Bridge will consist of a pavement. and concrete ramp on the Columbia River side of SR28, and two 177' prefabricated steel trusses over SR 28, landing into the 9th Street Park Plaza. All work shall be completed in accordance with the contract plans, special provisions, and the 2025 WSDOT Standard Specifications Time for completion of the work is limited to *415* working days. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashiers check, postal money order, or surety bond in an amount equal to at least five percent (5%) of the amount of the bid proposal. Checks shall be made payable to The City of Wenatchee. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Wenatchee. The City of Wenatchee reserves the right to reject any or all bids and to waive irregularities in the bid or in the bidding. This Contract has a thirteen percent (13%) COA DBE goal. This Contract has a 1600-hour training goal. No bidder may withdraw their proposal after the hours set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding for- ty-five (45) days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$12,500,000.00

Public - City

Paving, Site Work

146

10

2

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
92
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

img_map_placeholder

Multiple Locations, Wenatchee, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.