BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Olive Branch, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 28, 2025, at 1:30 PM at the Region Five/District Nine Office in Carbondale. Phase III engineering services are required to provide construction supervision, inspection, and documentation of bridge painting and inspection of work performed on S.N. 002-0022 along I-57 over the Mississippi River at Cairo. The completion date for this contract will be 48 months after authorization to proceed and work is expected to be performed during calendar years 2025, 2026, 2027, and 2028. The Consultant must complete and submit final measurements, calculations, and contract record documentation to the department no later than six (6) weeks after completion of the project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 Firms interested in submitting for this item that are not currently prequalified must establish an account in EPAS so the firms can submit a Statement of Interest. Any procedural questions regarding Statements of Interest submittal and to set up an account in EPAS may be directed to the Preliminary Engineering mailbox in the Bureau of Design and Environment at online. Prime and all Subconsultants will be required to establish an overhead rate compliant with the Federal Acquisition Regulation (FAR) and approved by the department. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 48 - RFP - Phase III Bridge Inspection Project, Alexander County, Region Five/District Nine

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
10
Bidding Soon
304
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

img_map_placeholder

Multiple Locations, Olive Branch, IL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.