BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated September 3, 2025

Site work and new construction of a transportation facility in North Charleston, South Carolina. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.

“The owner has determined a prequalified list of general contractors. A Request for Proposals for General Contractor has not yet been established.” https://www.postandcourier.com/chs-airport-parking-garage-construction-jpg/image_6b08be4b-c820-4767-a1a1-f256241b5640.html Construction on the parking garage expansion continues at Charleston International Airport, Tuesday, July 8, 2025, in North Charleston. ______________________ Description: Relocation of the existing Airport Surveillance Radar (ASR-9) system. The project includes but is not limited to 1) construction of a 108-foot structural steel tower supported by a driven pile foundation. 2) construction of a 3,375 SQ concrete masonry unit (CMU) base building supported on earthquake drains and shallow foundations, complete with an emergency backup generator. 3) Site grading and drainage infrastructure, along with the construction of a new access road. 4) Installation of approximately 8,000 LF of new fiber duct bank and approximately 18,000 LF of cable with new ASR site to the existing air traffic control Tower (ATCT) and the terminal radar approach control. 5) Demolition of the existing ASR tower site, located off International Boulevard, upon completion of the new system's commissioning. Question Deadline 07/17/2025 at 5:00 PM ET Any questions or requests for clarification of the Proposal Documents shall be made in writing and delivered via email to Carrie Stanley at ccaaprocurement@iflychs.com.

Final Planning

Transportation Terminals

$30,000,000.00

Public - County

New Construction, Site Work

125

29

302

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
38
Bidding Soon
943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

February 16, 2026

Project location map

5500 International Blvd, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.