Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 11, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of a military facility in Trenton, New Jersey. Completed plans call for the renovation of a military facility.
Amendment 0001 - The purpose of this amendment is to: a. Revise attachment L-1 Section to insert para L-1.13 and amend para 2.2.2.7. b. Insert Clause 52.236-27 Site Visit (Construction) Question Deadline 12/18/2024 at 10:00 AM ET Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, please contact Jasmin Rankins at jasmin.rankins@us.af.mil. The dorm renovation at building 2424 is a new construction requirement for Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey. The work includes work demolition, construction, renovation, and incidental related work and will consist of areas that are typical of living spaces for dormitories. The construction requirement shall include but is not limited to the following: Refurbishment of bathrooms and bedrooms with new finishes, plumbing fixtures, shower stalls, and casework. Relocation of telecom rooms and refurbishment of hallways/public spaces with new finishes, signage, and window blinds. New electrical service entrance switchboard, new LED lighting throughout, additional grounding, and telecom outlets. Demolition of all unused wiring systems and devices. Hazardous material removal and remediation of asbestos, lead paint, and mold. Period of performance : 360 days The work includes work demolition, construction, renovation, and incidental related work and will consist of areas that are typical of living spaces for dormitories. The construction requirement shall include but is not limited to the following: Refurbishment of bathrooms and bedrooms with new finishes, plumbing fixtures, shower stalls, and casework. Relocation of telecom rooms and refurbishment of hallways/public spaces with new finishes, signage, and window blinds. New electrical service entrance switchboard, new LED lighting throughout, additional grounding, and telecom outlets. Demolition of all unused wiring systems and devices. Hazardous material removal and remediation of asbestos, lead paint, and mold. the estimated magnitude of this construction project is Between $10,000,000 and $25,000,000 Jasmin Rankins: jasmin.rankins@us.af.mil Wanda Wilson: wanda.wilson.1@us.af.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$25,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2025
April 11, 2025
To Be Determined, Trenton, NJ
Related To This Project
Trenton, NJ
--
Trenton, NJ
Bid Date: Jan 15 2025
Trenton, NJ
Bid Date: Nov 13 2024
Trenton, NJ
Bid Date: Nov 21 2024
Trenton, NJ
Bid Date: Nov 14 2024
Trenton, NJ
Bid Date: Nov 19 2024
Trenton, NJ
Bid Date: Dec 03 2024
Trenton, NJ
Bid Date: Dec 17 2024
Trenton, NJ
Bid Date: Dec 05 2024
Trenton, NJ
Bid Date: Feb 14 2025
Trenton, NJ
Bid Date: Nov 15 2024
Trenton, NJ
Bid Date: Nov 19 2024
Trenton, NJ
Bid Date: Nov 19 2024
Trenton, NJ
Bid Date: Nov 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.