Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2024 at 7:00 PM
Updated December 7, 2024
Site work for a water / sewer project in Marion, Alabama. Completed plans call for site work for a water / sewer project.
The Project includes the following Work: Interior & Exterior Rehabilitation including repairs of (5) potable water storage tanks and related all appurtenances. Bid security shall be furnished in accordance with the Instructions to Bidders. This project is being funded by SRF and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after the bid opening. This project is being supported, in whole or in part, by federal award number SLFRP2635 awarded to the State of Alabama by the U. S. Department of the Treasury. All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (American Iron and Steel Requirement) and those imposed by the Build America, Buy America (BABA) requirements. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest, responsive, and responsible bidder. All bidders shall submit, upon request, a list of projects "successfully completed" in the last 2 years, having the same scope of work and approximate construction cost as specified in this project. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered. No bidder may withdraw his bid within 60 days after the opening thereof. Doc info : Prospective Bidders may examine the Bidding Documents at the Issuing Office Monday through Friday between the hours of 8:00 a.m. 5:00 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below. Said cost represents the cost of printing, reproduction, handling, and distribution, therefore no refund will be granted. Checks for Bidding Documents shall be payable to GMC. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.
Bid Results
Water / Sewer
$1,500,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
January 6, 2025
Multiple Locations, Marion, AL
Related To This Project
Unified Campus Safety System (integrated platform, video surveillance, and access control) - 5617723
Marion, AL
Bid Date: Dec 19 2024
Marion, AL
Bid Date: Dec 12 2024
Marion, AL
Bid Date: Jan 23 2025
Marion, AL
Bid Date: Jan 28 2025
Marion, AL
Bid Date: Feb 19 2025
Marion, AL
Bid Date: Apr 08 2025
Marion, AL
Bid Date: Mar 25 2025
Marion, AL
Bid Date: Apr 17 2025
Marion, AL
Bid Date: Oct 31 2024
Marion, AL
Bid Date: Oct 21 2024
Marion, AL
--
Marion, AL
Bid Date: Aug 30 2024
Marion, AL
Bid Date: Aug 08 2024
Marion, AL
Bid Date: May 28 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
