BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Toledo, Ohio. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Environmental Supervision of Demolition and Cleanup Work with VAP Clearance Question Deadline 11/15/2024 at 2:30 PM ET Quotes for the Work must be submitted electronically Quotes should be emailed to Joshua Murnen, Senior Vice President for Real Estate and General Counsel, at lucascountylandbank@co.lucas.oh.us and at jmurnen@co.lucas.oh.us. Questions regarding this request for quotes should be directed in writing to these email addresses no later than November 8, 2024. The Land Bank will post responses to all questions received on its online. The Land Bank intends to demolish all structures and foundations on the property, excavate and remove all concrete and pavement on the property, and to remediate the contaminated soil identified in the Environmental Remediation Workplan, leaving a clean, level, and seeded site. The Land Bank will procure a CEP to supervise the demolition and cleanup activities at the project site. The CEP will supervise excavation and disposal of the contaminated soil, conduct confirmation sampling at the Project Site following completion of demolition and excavation work, and assist Owner in obtaining a CNS from the Ohio EPA through the VAP. The Land Bank has secured funding to conduct cleanup and remediation work at the Project Site through the Brownfield Remediation Program, administered through the Ohio Department of Developmen Project Site 215 City Park Avenue, Toledo, Ohio 43604 Parcel Number: 11-21774, 11-21824, and 11-21841 Owner expects to procure a demolition contractor for the project in December, 2024. Work is expected to commence as soon as January, 2025, subject to weather conditions and the contractor's schedule. Work will be completed no later than May 1, 2025. The CEP will be expected to be engaged throughout the project consistent with the Scope of Work described above. Scope of Work The Work will be consistent with the Environmental Remediation Workplan created by CT Consultants in November of 2023, attached to this RFQ. Quotes for the environmental assessment work must include itemized costs for each of the following work items (the "Work") The Environmental Remediation Work Plan, the previous Phase I ESA (2008), and previous Phase II ESA (2011) are available on the Land Bank's online. The Land Bank intends to demolish all structures and foundations on the property, excavate and remove all concrete and pavement on the property, and to remediate the contaminated soil identified in the Environmental Remediation Workplan, leaving a clean, level, and seeded site. The Land Bank will procure a CEP to supervise the demolition and cleanup activities at the project site. The CEP will supervise excavation and disposal of the contaminated soil, conduct confirmation sampling at the Project Site following completion of demolition and excavation work, and assist Owner in obtaining a CNS from the Ohio EPA through the VAP. The Land Bank has secured funding to conduct cleanup and remediation work at the Project Site through the Brownfield Remediation Program, administered through the Ohio Department of Development. Assist Owner with developing a scope of work for the demolition and excavation work at the project and with drafting a Request for Bids and procuring a demolition contractor.

Post-Bid

Municipal

$200,000.00

Public - County

Demolition, Site Work

20

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
75
Bidding Soon
1,296
All Active Projects
589
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

January 1, 2025

img_map_placeholder

215 City Park, Toledo, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.