BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2024 at 7:00 PM

Updated November 21, 2024

Site work for a water / sewer project in Stanford, Kentucky. Completed plans call for site work for a water / sewer project.

The Project consists of CONTRACT TWO Water Line Construction Phase 1B -- (McCormack Church to McKinney) Construct 17,500 feet of 8-inch DR 17 PVC water main, 17,840 feet of 8-inch DR 21 PVC water main, 1,340 feet of 6-inch DR 21 PVC water main, 3,210 feet of 4-inch DR 17 PVC water main, 1,320 feet of 4-inch DR 21 PVC water main, and related piping, fittings, equipment, and restore construction site. Water Line Construction Phase 1B -- Add Alternate One (McKinney Ridge) Construct 920 feet of 4-inch DR 17 PVC water main, 2,614 feet of 4-inch DR 21 PVC water main, pumping booster station, and related piping, fittings, equipment, and restore construction site. Water Line Construction Phase 1B -- Add Alternate Two (KY HWY 78) Construct 5,700 feet of 8-inch DR 21 PVC water main, and related piping, fittings, equipment, and restore construction site. The Issuing Office for the Bidding Documents is: AGE Engineering Services, Inc. 204 Fosters Lane, Stanford, KY, Marty Spears, Project Engineer. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 to 5:00, and office of the McKinney Water District on Mondays through Fridays between the hours of [9:00 to 4:00], and may obtain copies of the Bidding Documents from the Lynn Imaging, Lexington KY as described below. Bidders shall comply with the following regulations: 1) Kentucky Public Service Commission rulings. CONTRACT 2 and CONTRACT 3 include the following regulations: 2) This project will be funded by Kentucky Infrastructure Authority State Revolving Loan Program. And other agencies. 3) This agreement is for services related to a project that is subject to the Build America Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act ("IIJA") Pub. L, 177-58. Absent and approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined in the Office of Management and Budget's Memorandum M-22- 11, Initial Implementation Guidance on application of Buy American Preference in Federal Assistance Programs for infrastructure, April 18, 2022. 4) Federal Wage Rate determinations will apply to this project. Question Deadline 11/13/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Post-Bid

Water / Sewer

$820,000.00

Public - County

Site Work

30

13

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
98
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

December 20, 2024

Project location map

Multiple Locations, Stanford, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.