Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 14, 2025 at 8:00 PM
Updated April 15, 2025
This is a service / maintenance or supply contract in Susanville, California. Contact the soliciting agency for additional information.
HIGH DESERT STATE PRISON ROOF REPLACEMENT PHASE II (ROOF BCP) FOB DESTINATION See IFB page 2 for complete product description. NOTE: DELIVERIES MAY NEED TO BE MADE WITHIN THE SECURE PERIMETER. GATE CLEARANCES WILL BE REQUIRED. PLEASE SEE SOW, PAGE 5. C-YARD BLDGS 342, 343, and 344 ROOF ASSEMBLY, HIGH DESERT STATE PRISON Bid per plans and specifications. A detailed materials list FOR EACH ROOF, including quantities, unit pricing and brand/model information, must be provided with bid. Bidders are required to fill out the CDCR Roof System Review Checklist (Attachment XI) and return it as part of the bid documents. All Lot deliveries must be coordinated with project CSII's prior to delivery or will not be accepted. LOTS FOR EACH ROOF TO INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING (AS APPLICABLE): Roofing membrane, membrane flashings, detail Membrane white strip, cover strip, rigid roofing insulation, tapered insulation, crickets, vapor barrier retarder, 1/2" protection roof boards (primed and un-primed), foil face tapes, wall and base roof vents, termination tapes, fasteners, anchors, termination bars, protection walk pads, pipe flashings, pre primed barrier boards, stainless steel pipe clamps, pre-formed crickets and cant, scuppers and retro-fit roof drain insert extensions. All extruded polystyrene (XPS) insulation, XPS tapered insulation, gypsum sheathing, all membrane for roof, wall, base, scuppers, roof vents, flashings, mechanical curbs and walk pads. C-YARD BLDGS 342 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list). Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) C-YARD BLDGS 343 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) FAC. B BLDG 344 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) Written questions must be received by 5:00 PM, close of business on 11/22/2024. additional site visit note: Gate Clearance information may be submitted to: California Department of Corrections and Rehabilitation HIGH DESERT STATE PRISON Attn: Mike Carter, CS II Phone: (530) 257-5918 E-mail: michael.carter2@cdcr.ca.gov cc: Pamela.Snedeker@cdcr.ca.gov cc: Phillip.Unterreiner@cdcr.ca.gov
Post-Bid
Jails / Prisons
Public - State/Provincial
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2024
January 30, 2025
475-750 Rice Canyon Rd, Susanville, CA
Related To This Project
Susanville, CA
Bid Date: Dec 30 2024
Susanville, CA
Bid Date: Feb 06 2025
Susanville, CA
Bid Date: Feb 05 2025
Susanville, CA
Bid Date: Jan 24 2025
Susanville, CA
Bid Date: Feb 20 2025
Susanville, CA
Bid Date: Mar 26 2025
Susanville, CA
Bid Date: May 02 2025
Susanville, CA
Bid Date: Apr 02 2025
Susanville, CA
Bid Date: Oct 08 2024
Susanville, CA
Bid Date: Sep 24 2024
Susanville, CA
Bid Date: Jul 18 2024
Susanville, CA
Bid Date: Jul 03 2024
Susanville, CA
Bid Date: Jun 18 2024
Susanville, CA
Bid Date: Jul 26 2024
Susanville, CA
Bid Date: May 01 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
