BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in Susanville, California. Completed plans call for the renovation of a detention facility.

C-YARD BLDGS 342, 343, and 344 ROOF ASSEMBLY, HIGH DESERT STATE PRISON Bid per plans and specifications. A detailed materials list FOR EACH ROOF, including quantities, unit pricing and brand/model information, must be provided with bid. Bidders are required to fill out the CDCR Roof System Review Checklist (Attachment XI) and return it as part of the bid documents. All Lot deliveries must be coordinated with project CSII's prior to delivery or will not be accepted. LOTS FOR EACH ROOF TO INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING (AS APPLICABLE): Roofing membrane, membrane flashings, detail Membrane white strip, cover strip, rigid roofing insulation, tapered insulation, crickets, vapor barrier retarder, 1/2" protection roof boards (primed and un-primed), foil face tapes, wall and base roof vents, termination tapes, fasteners, anchors, termination bars, protection walk pads, pipe flashings, pre primed barrier boards, stainless steel pipe clamps, pre-formed crickets and cant, scuppers and retro-fit roof drain insert extensions. All extruded polystyrene (XPS) insulation, XPS tapered insulation, gypsum sheathing, all membrane for roof, wall, base, scuppers, roof vents, flashings, mechanical curbs and walk pads. C-YARD BLDGS 342 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list). Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) C-YARD BLDGS 343 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) FAC. B BLDG 344 - ROOF ASSEMBLY COMPLETE ROOFING SYSTEM, thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil, with factory applied felt backing in 6' X 80' or 10' X 80' rolls, white exposed face color, to cover approximately 31,166 square feet of roof. Bid must include all materials to be installed over a concrete deck. SHEET METAL PRODUCTS, not to be delivered until requested by IWL Construction Supervisor, to include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) Coping metal must be provided per specs. ADHESIVES AND SEALANTS FOR ROOF AND WALLS: To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) TECHNICAL ASSISTANCE, on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. WARRANTY, Manufacturer's, Standard Ten (10) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07 54 19.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. SUBMITTALS, per attached spec section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) of all roofing materials (including separate shipping fee) to be delivered only upon request of Construction Supervisor: (Quantity, unit price and product information of all items must be included on materials list.) THIS FOLLOWING WILL PERTAIN TO ALL LINE ITEMS ON THE PURCHASE ORDER: Materials to be delivered upon written request of Construction Supervisor. Requested materials may not be split into multiple deliveries. If shipped separately, deliveries may be rejected. Exceptions may be made by the Construction Supervisor. Written approval is required prior to delivery. All requested materials must be delivered within 3 business days or within 3 business days of the first delivery (if prior approval from Construction Supervisor has been obtained). Invoice for requested materials must match Construction Supervisor's written request prior to acceptance and invoice submission. If vendor fails to deliver as requested, the delivery may be rejected, and the vendor shall remove all materials from site within five (5) business days at vendor's expense. Prospective vendors must initial below to indicate their understanding and compliance. additional walkthrough note: Gate Clearance information may be submitted to: California Department of Corrections and Rehabilitation HIGH DESERT STATE PRISON Attn: Mike Carter, CS II Phone: (530) 257-5918 E-mail: michael.carter2@cdcr.ca.gov cc: Pamela.Snedeker@cdcr.ca.gov cc: Phillip.Unterreiner@cdcr.ca.gov

Sub-Bidding

Jails / Prisons

$150,000.00

Public - State/Provincial

Renovation

10

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
149
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

475-750 Rice Canyon Rd, Susanville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.