BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Los Angeles, California. Conceptual plans call for the renovation of a educational facility.

UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed UCLA Semel Institute 5th Floor Transcranial Magnetic Stimulation (TMS) Program Renovation (UCLA Project 907109.01). This project is an approximately 13,788 asf (22,818 gsf) program on the fifth floor of the Semel Institute Building, an eleven-story, 170,396 asf (294,992 gsf) structure built in phases between 1958 and 1967. The proposed project would develop a tenant improvement master plan for the 5th floor of the Semel Institute building to support the renovation of the Transcranial Magnetic Stimulation (TMS) Program. The space program for TMS is anticipated to include the renovation of the existing office, research lab, clinical, conference, support, building core, and common area spaces, in addition to developing construction documentation and assisting the University in securing Regental and Agency approvals for the proposed program, building core and common area improvements. The scope of work is anticipated to include the demolition of current improvements in the way of the proposed work; replacement of existing flooring and wall finishes; installation of suspended ceilings, lighting, casework; renovation of existing restrooms, plumbing fixtures, and environmental control systems; modifications to air distribution and return systems; provision of power; modifications to the fire alarm system and fire sprinkler systems; installation of conduit and cabling for communications connectivity and security systems; installation of signage; and interior finishes. Existing improvements impacted by the work would be restored. The project may also require installing new or relocating existing medical equipment. The construction cost for the project has not yet been determined and may be executed through several phased, separate incremental projects. However, it is anticipated that the total construction cost may be between $2 to $3 million, depending on the agreed-upon scope of work. The final selection and appointment of the architect for the proposed project are contingent upon project approval by the University of California Board of Regents or their delegated authority and per the California Environmental Quality Act (CEQA). The project is subject to review and approval by the UC Board of Regents or their delegated authority. The selection committee will base their review of the Executive Architect's submitted proposals and selection on the Selection Criteria form (Attachment A). This RFQ is for full design services; however, the University reserves the right to defer negotiations concerning services other than pre-design studies until the completion of the pre-design phase. The design shall comply with the University of California Policy on Sustainable Practices concerning green building design and energy efficiency. The project must meet the California Energy Code (Title 24) energy efficiency standards and apply sustainability principles to the renovated building's systems, components, and portions of the renovated building. To download the packet, you must create a login and password. Registration instructions are available online Once in the Planroom, click the RFQ tab and search for the project to download. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its Equal Employment Opportunity policy. Peter E. Hendrickson, AIA Associate Vice-Chancellor Design and Construction UCLA Capital Programs 1060 Veteran Avenue | Box 951365 Los Angeles, CA 90095-1365

Conceptual

Educational

$1,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,243
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

img_map_placeholder

To Be Determined, Los Angeles, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.