BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hamburg, Arkansas. Completed plans call for site work for a water / sewer project.

Furnishing All Tools,materials, Labor, and Performing the Necessary Work for the Installation of Approximately 500 Linear Feet of 4" Restrained Water Line,18,500 Linear Feet of 6" Sdr-21 Pvc Water Line, and Other Appurtenances. Question Deadline 11/30/2024 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer Project: Job 020676 - Highway82 - East of Hamburg - Mist (Widening) (S), Route 82, Section 9 Water Line Relocation Hamburg Water Department Ashley County, Arkansas The Contractors Shall Make such Inspection and Studies of the Site of the Work as to Familiarize Themselves With All Conditions to Be Encountered. Each Bid Must Be Accompanied by an Acceptable Statement Of bidder's Qualifications. The Requirements of the Bidder's Statement of Qualifications Will Be furnished to Prospective Bidders with Plans and Specifications. Each Bid Must Be Accompanied by an Acceptable Form of Bid guaranty in the Amount Equal to At least Five Percent of the Whole Bid, And Such Bid Bond or Cashier's check Shall Be Subject to the Conditions Provided in the Instructions to Bidders. Bids Must Be Made Upon the Official Bid Sheets Contained in the Specifications, and Such Bid Sheets Shall Not Be Removed From the Remainder of the Specifications and Contract Documents. All Bids Shall Be Sealed and the Envelopes Addressed to Mayor David Streeter, Hamburg Water Department, 305 E Adams Street, Hamburg, Arkansas 71646. All Bids Shall Be Plainly Marked On the Outside of the Envelope Specifying That It is a Sealed Bid for Water Line Relocation - Hwy 82 (Ardot Job 020676), the Time for Opening of Bids, and the Name and Current Contractor's License Number of the Bidder. Bidders Are Required to Have a Contractor's License Under the Terms of Act 150, Arkansas Acts of 1965, as Amended. The Owner Reserves the Right to Reject Any and All Bids and to Waive Any Informalities in the Proposal Deemed to Be in the Best Interests of the Owner. The Owner Further Reserves the Right to Withhold the Awarding of the Contract for a Period Not to Exceed 60 Days After the Receipt of Bids.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

22

12

2

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
5
Bidding Soon
116
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

January 9, 2025

img_map_placeholder

US-82, Hamburg, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.