BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2024 at 7:00 PM

Updated November 5, 2024

Site work and paving for a road / highway in Daytona Beach, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 4, 2024, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in December 2026, with construction starting early 2027. 450666-1 This project plans to mill and resurface State Road (S.R.) A1A from U.S. 1 (Ridgewood Avenue) in Daytona Beach Shores to Davis Street in Daytona Beach, including the bridge over the Halifax River. Pedestrian safety enhancements including new and upgraded crosswalks are being designed under 450666-2.

Design

Roads / Highways

$11,950,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
130
Bidding Soon
1,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2026

Project location map

A1A Jimmy Buffett Mem Hwy, Daytona Beach, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.