BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2024 at 7:00 PM

Updated December 28, 2024

Site work and paving for a road / highway in Butler, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work shall consist of furnishing all products and performing all labor to construct sidewalks, curbs and gutters, site furnishing, storm drainage, and any other items shown or implied in the Construction Drawings. Time allotted for completion of work is 240 consecutive calendar days. All work shall be completed in accordance with the Plans & Specifications. This project is funded in part or by Improving Neighborhood Outcomes in Disproportionately Impacted Communities (INODIC) through the Governor's Office of Planning & Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the project, including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal Requirements are included in the Contract Documents. Contact Carter & Sloope, Inc. for full Advertisement. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. The Scope of Work as described herein is defined as "General contracting" in accordance with O.C.G.A 43-41-1-18 so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "General Contractor". Any work installed below five below existing grade must be performed by a Georgia licensed utility contractor. See Instruction to Bidders for additional bidding requirements. This project is funded in part or whole by Improving Neighborhood Outcomes in Disproportionately Impacted Communities (INODIC) Funds through the Governor's Office of Planning & Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of requirements, including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal requirements are included in the contract documents. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Question Deadline 11/28/2024

Award

Roads / Highways

$1,728,364.00

Public - City

Paving, Site Work

39

21

8

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
86
Bidding Soon
901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

Multiple Locations, Butler, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.