BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Demolition and site work for a mixed-use development in Butler, Georgia. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and water / sewer project.

**As of February 11, 2025 , this project has not yet been awarded. A timeline for award has not yet been established. Elementary School Demolition The project scope includes the demolition of the existing Taylor County Elementary School. Work includes, disconnecting and terminating existing utilities, demolition of the existing structure, disposal of waste materials removed, and restoration of site grades. The asbestos containing materials have, as part of a separate contract, been removed from the structure. Each bid shall be submitted on the prescribed BID FORM. All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and figures, and the certification shall be completed and executed when submitted. No modifications to the bid form allowed Contract, if awarded, will be on a lump-sum basis. No bid may be withdrawn for a period of sixty (60) days after time and date of opening. Each bid must be accompanied with a BID BOND (Bond only; certified checks or other forms are not acceptable) in an amount equal to 5% of the base bid, payable to the OWNER and issued by a Surety authorized to do business in the State of Georgia, in order to guarantee that the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and Contract Documents, should the construction contract be awarded to him. The successful bidder shall be required to furnish a bond for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to 100% of the Contract Price. Both bonds shall be issued by a Corporate Surety authorized to do business with the State of Georgia. All bids submitted shall remain open for a period of sixty (60) days after the date of the bid opening. The owner reserves the right to reject any or all bids and to waive technicalities and informalities. The project scope includes the demolition of the existing Taylor County Elementary School. Work includes, disconnecting and terminating existing utilities, demolition of the existing structure, disposal of waste materials removed, and restoration of site grades. The asbestos containing materials have, as part of a separate contract, been removed from the structure.

Bid Results

Educational

$191,250.00

Public - County

Demolition, Site Work

6

13

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
86
Bidding Soon
900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2025

February 3, 2025

Project location map

218 E Main St, Butler, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.