Published October 31, 2025 at 8:00 PM
Updated November 4, 2025
Site work for a water / sewer project in Butler, Georgia. Completed plans call for site work for a water / sewer project.
Work to be done shall include furnishing all products and equipment and performing all labor necessary to construct the following: installation of approximately 13,555 L.F. of 12" PVC Water Main, +/- 1,083 L.F. of 8" Water Main, +/- 167 L.F. of 6" Water Main, +/- 100 L.F. of Jack & Bore 20" Steel Casing to be installed in Norfolk Southern Rightof-Way, +/- 328 L.F. of Jack & Bore 18" Steel Casing in GDOT Right-of-Way, +/- 62 L.F. of Jack & Bore 12" Steel Casing in GDOT Right-of-Way, installation of new fire hydrants, pressure reducing valve, water service transfers, valves, plugging and abandonment of existing water mains, and all other appurtenances necessary to complete the project in accordance with the Technical Specification and Construction Drawings. This project will be awarded in one (1) contract. Project must be completed by October 31, 2026. Time allotted for completion of work is 300 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. All other questions may be directed to the issuing office, Carter & Sloope, Inc., 6310 Peake Road, Phone: 478-477-3923. Question Deadline 09/08/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Will Jackson , 6310 Peake Road, Macon, GA, 31210 478-477-3923 ; wjackson@cartersloope.com . Questions received less than seven days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$2,466,400.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
October 15, 2025
Multiple Locations, Butler, GA
Related To This Project
Butler, GA
Bid Date: Nov 21 2025
Butler, GA
Bid Date: Nov 21 2025
Butler, GA
Bid Date: Aug 08 2025
Butler, GA
Bid Date: Sep 09 2025
Butler, GA
--
Butler, GA
Bid Date: Jan 07 2025
Butler, GA
Bid Date: Dec 05 2024
Butler, GA
Bid Date: Mar 26 2025
Butler, GA
Bid Date: Aug 23 2024
Butler, GA
Bid Date: Aug 23 2024
Butler, GA
Bid Date: Jun 28 2024
Butler, GA
Bid Date: Apr 29 2024
Butler, GA
Bid Date: Feb 18 2022
Butler, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.