BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work, paving and remodeling of a mixed-use development in Laredo, Texas. Completed plans call for the remodel of a 4,011-square-foot municipal facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

SCOPE OF WORK The general scope includes, but not limited to: the general remodeling - renovation of the City of Laredo World Trade Bridge Building to include but not limited to: project allowances per project manual specifications, selective demolition of interior 1st and 2nd level non-bearing drywalls, suspended ceilings, porcelain flooring, wall base, hollow metal doors, frames, security window units, security stations, access control hardware, HVAC air handlers, compressors, and system components, lighting, power, fire alarm, security, CCTV system, general plumbing rough in and fixtures, and selective demolition of exterior / perimeter walls, aluminum windows, stone veneer / plaster to address wall waterproofing with new site parking and driveway asphaltic sealant, parking space striping, HC symbols, flatwork, fence / gates modifications, metal canopies, concrete flatwork, new / replacement flag stone veneer, masonry accessories, metal stud framing, galv. steel metal decking, misc. steel angles, and fabrications, rough carpentry, finish carpentry, millwork, custom solid counter tops and bases, standing seam roofing system, roof deck insulation, wall and decking elastomeric waterproofing membrane, metal flashings, prefinished gutters, downspouts, hollow metal door frames, doors, aluminum windows, security windows and glazing, security counter trays, new porcelain tile/base per allowances, 3 coats traditional plaster, traditional and metal panel suspended ceilings, metal wall panels, interior and exterior paint work, interior signage, new metal plaque, black out shades, metal storage shelving with mechanical, electrical, plumbing, CCTV, data IT, fire alarm, fire sprinkler system modifications / improvements as per the plans and specifications. Question Cuttoff Date & Time 12/6/2024 12:00:00 PM (CT) Construction contract time for the project is (270) working days.

Post-Bid

Municipal

$1,500,000.00

Public - City

Paving, Remodeling, Site Work

40

22

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 17, 2025

Project location map

11601 FM 1472, Laredo, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.