BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.

Town of Oro Valley is conducting a competitive one-step request for qualifications with the intent of contracting with a construction services provider to perform as a Construction Manager at Risk and work alongside the Town's design consultant for successful delivery of the Northwest Recharge, Recovery and Delivery System (NWRRDS) Partners' Booster Stations Construction Manager at Risk (CMAR). This project is being funded by the Water Infrastructure Finance Authority (WIFA) Federal Davis Bacon wages will apply to this project. Promotion of Small, Minority and Women-owned Businesses and participation in EPA's Disadvantaged Business Enterprise (DBE) Program is required. All inquiries regarding this solicitation must be directed to Cherie Odeski, Chief Procurement Officer at caodeski@orovalleyaz.gov. The Town of Oro Valley takes no responsibility for informing recipients of changes to the original solicitation document. It is the Offeror's responsibility to obtain a copy of any addenda/amendments relevant to this solicitation. Failure to submit amendments with the solicitation response may be grounds for deeming a respondent non-responsive. Northwest Recharge, Recovery and Delivery System (NWRRDS) Partners' Booster Stations - Construction Manager at Risk The qualified construction manager/ general contractor retained by OVWU will provide pre-construction assistance and complete construction services as the Construction Manager at Risk (CMAR) for these facility improvements. 5. Development and management of GMP agreements and progress pay requests with consideration of individual partners' scope and work completed. The selected CMAR will be expected to participate as part of the design team and work closely with OVWU, Partners' technical staff, and the Design Professional, as required, throughout the project. The CMAR will be responsible for adherence to the design schedule, construction schedule, and project budget. The CMAR will provide continuous value engineering and constructability consultation; and will complete regular cost and schedule updates. Construction Phase Services by the CMAR will include, but not be limited to the following: 1. General contracting and construction 2. Team management and coordination. 3. Critical Path Scheduling. 4. Processing submittals in a timely process. 5. Cost control and change order management 6. Subcontracting. 7. Field management. 8. Safety and quality control programs. 9. Procuring long-lead time items. 10. Start-up, performance testing and commissioning services. 11. Project close out and warranty period services. The tentative schedule for construction of the project is December 2024 through December 2025 Question Deadline 11/26/2024 at 5:00 PM MT Any question related to the solicitation shall be directed to Cherie Odeski, Chief Procurement Officer, at caodeski@orovalleyaz.gov. The contact person will require any and all questions to be submitted via email. Offerors are encouraged to submit written questions via electronic mail or facsimile, no later than 5 p.m. Tucson time, at least five business days prior to the submittal date or as provided by addenda, if issued Oral interpretations or clarifications will be without legal effect. Only questions answered by a formal written addendum to the solicitation will be binding.

GC Bidding

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
13
Bidding Soon
289
All Active Projects
114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

April 3, 2025

img_map_placeholder

To Be Determined, Tucson, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.