BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

Site work, paving and renovation of a bridge / tunnel in Two Harbors, Minnesota. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This is a total small business set-aside under NAICS Code 237310, size standard $45M. The magnatude of this project is between $25,000 and $100,000. The Cloquet River Bridge is located on Forest Road 122 in Township 56N, Range 12W, Section 25 (47.3099N, 91.7964W) in St Louis County MN. The Cloquet River Bridge constructed in 1957, is 67 years old two span continuous concrete beam bridge with a center pier. Seasonal peak flow in the Cloquet River is typically between 1000-2000cfs. The June 18, 2024 Storm Event caused a peak flow of around 6000 cfs. The flooding appears to have overtopped road and bridge as the bridge deck was washed clean and there is debris on the road shoulder at bridge ends. There is major degradation and scour of the riverbed. There was a debris jam on the pier nose. A dive investigation found severe scour at the pier. The center pier footer is completely undermined for about 2/3 of it's length. (See attached undermining sketch.) It is assumed that the reinforced concrete superstructure (continuous over the pier) is currently supporting the pier from rotating into the scour hole. Without repairing the undermining prior to spring flows, it is feared the scour will increase and the bridge will collapse. This project is intended stabilize the bridge until a replacement bridge can be funded, designed and constructed. The bridge is currently closed to all traffic and will remain closed to all traffic upon completion of the work. Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract. b) One award will be made from this solicitation, contractors must submit pricing for all items Period of Performance: 11/26/2024 to 12/31/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 11/21/2024 Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing. Subsequent to the conference, an amendment to the solicitation containing an abstract of the questions and answers, and a list of attendees, will be disseminated

Award

Bridges / Tunnels

$30,800.00

Public - Federal

Paving, Renovation, Site Work

3

7

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

December 26, 2024

Project location map

Forest Road 122, Two Harbors, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.