EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2024 at 7:00 PM

Updated October 1, 2024

Site work and asbestos abatement for an educational facility in Dover, Delaware. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

The work consists of the removal of positive and assumed asbestos-containing materials on the interior of the school building in accordance to the bidding documents. A bid bond is required. A performance bond and payment bond is required if the based bid is greater-than $ 50,000.00. Desired Work Schedule and Sequence: The Owner desires that all work be completed as soon as possible without the addition of overtime hours. The Contractor shall start and complete the project in this desired sequence: a. All Base Bid work items and Alternate Bid (if awarded) work items must be completed while the asbestos abatement contractor has control of the work area. Prior to starting a work area, proper barrier walls and seals at floor access must be installed by the Contractor. After completion of a work area, clearance must be issued for that area. After clearance is granted, the work area will be occupied by other contractors to start and complete their work. Asbestos abatement work will be performed concurrent with construction activities during the duration of the project. b. Start and complete all asbestos abatement activities in each section of the building as shown on the drawings prior to starting another section. This will allow for the systematic removal of asbestos without the risk of cross contaminating the entire building if a containment breach would occur and allow construction activities to follow the asbestos abatement work. c. Perform the work using the following sequence: i. Main Building First Floor; Work Area 1 (East Side). ii. Main Building First Floor; Work Area 2 (West Side). iii. Main Building Second Floor. iv. Main Building Third Floor. v. East Wing First Floor. vi. East Wing Second Floor. d. Perform the work in a manner to preserve access to potable water and electrical power supplied to the contractor by the owner. e. Fire doors shall be removed as the last activity at each building work area.

Post-Bid

Educational

$202,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
118
Bidding Soon
1,692
All Active Projects
831
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Targeted Interior Asbestos Abatement at the Central Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.