BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work for a water / sewer project in London, Kentucky. Completed plans call for site work for a water / sewer project.

The primary scope of work includes the installation of approximately 3,470 LF of 6-inch PVC force main, 2,125 LF of 4-inch PVC force main, 70 LF of 8-inch steel encasement pipe, and related appurtenances. The OWNER reserves the right to waive any informality or to reject any or all bids. Each BIDDER must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. No BIDDER may withdraw his/her Bid within sixty (60) consecutive calendar days after the actual date ofthe opening thereof. Questions shall be addressed to Alan R. Robinson, P.E. of Eclipse Engineers, PLLC, 113 West Mt. Vernon Street, Somerset, Kentucky 42501 (606-451-0959) as stated in the Specifications or by email to arobinson@eclipseengineers.net. A. The primary scope of work includes the installation of approximately 3,470 LF of 6- inch PVC force main, 2,125 LF of 4-inch PVC force main, 70 LF of 8-inch steel encasement pipe, and related appurtenances. B. The Contractor shall include all materials, labor and equipment necessary for completion of the Project. The Contract Documents are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the Project shall be included. C. Continuous Operations: The existing system must be maintained in continuous operation in such a manner that it meets all local, state, and federal requirements. The Contractor is responsible not to deactivate, demolish, or interfere with any system required for the continuous operation until a temporary or new permanent-like system has been installed and is operational. The Contractor is responsible for payment of all fines resulting from any action or inaction on his part or the part of his subcontractors during performance of the Work that is illegal. D. The following major Work items are included in the Contract: 1. Force Main Installation Every request for such interpretation should be in writing addressed to Alan R. Robinson, P.E., Project Manager, Eclipse Engineers, PLLC, 113 West Mt. Vernon Street, Somerset, Kentucky 42501 and to be given consideration must be received at least five (5) consecutive calendar days prior to the date fixed for the opening of Bids

Award

Water / Sewer

$300,000.00

Public - City

Site Work

12

9

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
58
Bidding Soon
667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

February 12, 2025

Project location map

Sinking Crk Rd, London, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.