BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Silver Bay, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction Manager at Risk Multi-Modal Trailhead Center Pre-Qualification: Yes Question Deadline 11/22/2024 at 4:30 PM CT Questions about this RFP can be directed to the City Contact (Joshua Stier) via email with the subject line City of Silver Bay Multi-Modal Trailhead Center- CMAR Solicitation - Question(s). The deadline for such questions is online. (Responses to all questions will be posted via addendum on November 29, 2024) Description: The City of Silver Bay, Minnesota is seeking proposals from qualified interested parties to provide Construction Management at Risk (CMAR) services for the construction of a Multi-Modal Trailhead Facility (Project) at 109 Outer Drive, Silver Bay, MN . The completed project will provide safe and separate recreational trail access for both non-motorized and motorized traffic, all in one location, serving the 89-mile long Gitchi-Gami State Bike Trail, 150+ miles of the CJ Ramstad ATV/Snowmobile trail, 310+ miles of the Superior Hiking Trail (North Country National Scenic Trail), Black Beach Park on the shore of Lake Superior, and plenty more miles of local ATV, snowmobile, and biking trails completed and/or proposed. The facility will be open to the public, fully accessible, and will include the following facilities and amenities: new two-level trailhead building, with lower level providing 24/7 lavatory and shower facilities, and upper level providing space for meetings, party rental, etc., ample parking for cars/trucks and trailers, outdoor gathering plaza, playground, picnic areas, and open green spaces, all conveniently located adjacent to local businesses and services. The City of Silver Bay plans to retain a CMAR firm to facilitate the cost evaluation, constructability, scheduling and sequencing of work for the efficient use and proper allocation of available funds. The CMAR will be part of an integrated team (Project Team) to assure the scope of the project work and goals of the City are properly aligned through the construction process. Design: December 2024 - April 2025 o Permitting: April 2025 - June 2025 o Subcontractor Bidding: April 2025 o Construction: Site Development May 2025, Building Construction July 2025 o Completion: April 2026, Landscaping June 2026

GC Bidding

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

4

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
5
Bidding Soon
74
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

April 7, 2025

img_map_placeholder

109 Outer Dr, Silver Bay, MN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.